Our cooperation with the company Joint-Stock Company
"Group of Companies SHANECO" (JSC "GC SHANECO") has been going on since 2017 to the present. During this time, a large number of projects have been successfully implemented. Throughout the entire period of cooperation, the company has established itself as a reliable business partner that demonstrates a high level of knowledge and experience in its field, which allows us to provide high-quality services for engineering surveys. Attentive attention to detail and willingness to discuss any issues makes cooperation very comfortable.
Udokanskaya Med LLC expresses gratitude to JSC "GC SHANECO" for the high-quality performance of engineering surveys for the next project "Mining and Metallurgical Plant "Udokan". Storage site for sulfuric acid tank containers", during which JSC "GC SHANECO" proved itself as a professional company, demonstrating a high level of quality work, efficiency in solving problems, the ability to work in a team and focus on results. Udokanskaya Med LLC can confidently recommend SHANECO Group of Companies JSC as a reliable and proven partner for the implementation of projects of any complexity!
We hope for further constructive and fruitful cooperation.
Director of Design Management
(based on power of attorney No. 158 dated 02.11.2024) A.A. Malinsky -
In 2024, JSC GC SHANECO organized and carried out a set of works to obtain Urban Development Plans for land plots in the amount of 36 (thirty-six) land plots for the following objects: "Udokan Mining and Metallurgical Plant. Stage I of construction with a capacity of 12 million tons of ore per year."
Thanks to the professionalism and high qualifications of JSC GC SHANECO specialists, the ability to work in close cooperation with the customer, all work was completed with high quality within the specified time frame.
We note JSC GC SHANECO as a reliable partner open to cooperation. The level of professional training of the company's employees allows them to solve complex problems.
We recommend JSC GC SHANECO as a contractor for similar works, we note the high competitiveness of the company.
Also, the management of Udokanskaya Med LLC has agreed to post the review and news on the official website of JSC SHANECO Group
Director of Design Management A.A. Malinsky -
In 2023-2024, JSC "GC SHANECO" provided environmental support for the development and examination of design documentation for a capital construction project: "JSC Stoilensky GOK" Drainage Mine. Construction of a natural quality wastewater drainage system into a surface water body" consisting of:
• preliminary environmental assessment;
• environmental impact assessment (EIA);
• public discussions on the planned activity;
• preparation of section 8 of the design documentation "Environmental Protection Measures";
• technical participation in the State examination of design documentation and survey results.
The well-coordinated work of JSC "GC SHANECO" specialists made it possible to receive a positive conclusion from the State examination within the established time frame without additional financial and time costs.
The employees of JSC "GC SHANECO" demonstrated a high level of quality work, efficiency in solving problems and focus on results.
NTC NOVOTEK LLC thanks the company for the work done and recommends JSC SHANECO Group as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
Director of NTC NOVOTEK LLC O.I. Pisarev -
OOO "Pravourmiyskoye" has been cooperating with JSC "GC SHANECO" for several years in the context of various works in the field of engineering surveys.
In the period from 2022 to 2023, JSC "GC SHANECO" completed work on engineering and environmental surveys and documentation support for the facility "Mining and processing enterprise based on the tin ore deposit "Pravourmiyskoye". Underground mine with infrastructure."
During the engineering and environmental surveys, the necessary data were obtained to assess the impact of the planned, an assessment of the current state of the environment was made, and samples of all components of the natural environment were taken. Engineering surveys were carried out in a volume sufficient for the development of design and working documentation, and passing the state examination.
We note the high degree of personal responsibility of each specialist of your organization involved in this work, compliance with contractual deadlines, the shortest possible time for processing expert comments, effective interaction with the designer and the customer, the quality and information content of weekly reports and final documentation.
Based on the results of the review by the Federal Autonomous Institution "Glavgosexpertiza of Russia" of the technical report on engineering and environmental surveys as part of the design documentation set, a positive expert opinion was received.
During the work, JSC "GC SHANECO>> has proven itself as a professional Company. OOO "Pravourmiyskoye" thanks your company for the work done and recommends JSC "GC SHANECO" as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
General Director S. V. Antonov
-
In 2024, the Joint-Stock Company SHANECO Group of Companies (hereinafter referred to as JSC SHANECO Group of Companies) completed work on calculating greenhouse gas emissions from sources of objects with a negative impact on the environment of the Norilsk Obespechivayushchiy Kompleks Limited Liability Company (hereinafter referred to as the Customer, the Company).
The employees of JSC SHANECO Group of Companies demonstrated a high level of professionalism, close interaction with the Customer in the process of preparing the necessary initial data, and provided consulting support.
All work was completed on time, with high quality, the Company recommends JSC SHANECO Group of Companies as a contractor for similar work.
Acting Head of the Ecology Department Ya.V. Safonovа -
JSC "GC SHANECO" in 2023-2024 developed:
- inventory of sources of pollutant emissions into the atmosphere and a draft of Standards for permissible emissions of pollutants into the atmosphere for the object of the unauthorized environmental impact assessment of the Podgolechnoye mining and processing plant:
- a draft of Standards for permissible emissions of pollutants into the atmosphere for the object of the unauthorized environmental impact assessment of the Nizhneyakokitsky mining and processing plant.
The documentation was completed at a high level of quality. Both projects received positive expert and sanitary-epidemiological conclusions, as well as permits for emissions of pollutants into the atmosphere from the Office of Rosprirodnadzor in the Republic of Sakha (Yakutia).
We would like to especially note the flexibility and efficiency of the management and employees of SHANECO in resolving issues arising during the work, the ability to quickly respond to changes in legislation and find optimal solutions for the customer, thanks to which the cooperation was as productive and comfortable as possible.
We note JSC "GC SHANECO" as a reliable partner, open to cooperation, the level of professional training of the company's employees allows solving complex problems.
We recommend JSC "GC SHANECO" as a contractor for similar work, we note the high competitiveness of the company.
First Deputy General Director for Production N.V. Goncharov -
JSC "GC SHANECO" provided qualified consulting support during the commissioning of the Gold Recovery Plant at the Murzinskoye site. SHANECO's work included adjusting the "Environmental Protection Measures" section of the design documentation, including taking into account the clarifications received from the territorial office of Rosprirodnadzor, as a result of which the federal state environmental supervision body issued an environmental certificate of compliance (ECOZOS) for the capital construction project.
In addition, JSC "GC SHANECO" successfully completed work to obtain a Comprehensive Environmental Permit (CEP) for the Gold Recovery Plant at the Murzinskoye site (approved by the Order of the South Siberian Interregional Office of the Federal Service for Supervision of Natural Resource Management dated 01.07.2024 No. 1090-rd),
The work was completed with high quality within the scheduled time frame. We note the high readiness of the specialists of the SHANECO Group of Companies for constructive work with the customer and regulatory authorities, their focus on obtaining a positive result.
We recommend JSC "SHANECO Group of Companies" as a reliable partner and contractor for similar work.
Executive Director of OOO "Artel Prospectors Poisk" V.V. Olyunin -
JSC "GC SHANECO" in 2024, organized and held public discussions of the design documentation of the state environmental impact assessment facility "Underground mine at the Nerundinskoye gold deposit in the Severobaikalsk region of the Republic of Buryatia", including preliminary environmental impact assessment (EIA) materials.
Thanks to the professionalism and high qualifications of the specialists of JSC "GC SHANECO", the ability to work in close cooperation with the customer, all work was completed with high quality within the scheduled time frame.
We note JSC "GC SHANECO" as a reliable partner, open to interaction, the level of professional training of the company's employees allows solving complex problems.
We recommend JSC "GC SHANECO" as a contractor for similar work, we note the high competitiveness of the company.
Executive Director N.A. Garbuzov