References
-
Our cooperation with the company Joint-Stock Company
"Group of Companies SHANECO" (JSC "GC SHANECO") has been going on since 2017 to the present. During this time, a large number of projects have been successfully implemented. Throughout the entire period of cooperation, the company has established itself as a reliable business partner that demonstrates a high level of knowledge and experience in its field, which allows us to provide high-quality services for engineering surveys. Attentive attention to detail and willingness to discuss any issues makes cooperation very comfortable.
Udokanskaya Med LLC expresses gratitude to JSC "GC SHANECO" for the high-quality performance of engineering surveys for the next project "Mining and Metallurgical Plant "Udokan". Storage site for sulfuric acid tank containers", during which JSC "GC SHANECO" proved itself as a professional company, demonstrating a high level of quality work, efficiency in solving problems, the ability to work in a team and focus on results. Udokanskaya Med LLC can confidently recommend SHANECO Group of Companies JSC as a reliable and proven partner for the implementation of projects of any complexity!
We hope for further constructive and fruitful cooperation.
Director of Design Management
(based on power of attorney No. 158 dated 02.11.2024) A.A. Malinsky -
In 2024, JSC GC SHANECO organized and carried out a set of works to obtain Urban Development Plans for land plots in the amount of 36 (thirty-six) land plots for the following objects: "Udokan Mining and Metallurgical Plant. Stage I of construction with a capacity of 12 million tons of ore per year."
Thanks to the professionalism and high qualifications of JSC GC SHANECO specialists, the ability to work in close cooperation with the customer, all work was completed with high quality within the specified time frame.
We note JSC GC SHANECO as a reliable partner open to cooperation. The level of professional training of the company's employees allows them to solve complex problems.
We recommend JSC GC SHANECO as a contractor for similar works, we note the high competitiveness of the company.
Also, the management of Udokanskaya Med LLC has agreed to post the review and news on the official website of JSC SHANECO Group
Director of Design Management A.A. Malinsky -
In 2023-2024, JSC "GC SHANECO" provided environmental support for the development and examination of design documentation for a capital construction project: "JSC Stoilensky GOK" Drainage Mine. Construction of a natural quality wastewater drainage system into a surface water body" consisting of:
• preliminary environmental assessment;
• environmental impact assessment (EIA);
• public discussions on the planned activity;
• preparation of section 8 of the design documentation "Environmental Protection Measures";
• technical participation in the State examination of design documentation and survey results.
The well-coordinated work of JSC "GC SHANECO" specialists made it possible to receive a positive conclusion from the State examination within the established time frame without additional financial and time costs.
The employees of JSC "GC SHANECO" demonstrated a high level of quality work, efficiency in solving problems and focus on results.
NTC NOVOTEK LLC thanks the company for the work done and recommends JSC SHANECO Group as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
Director of NTC NOVOTEK LLC O.I. Pisarev -
OOO "Pravourmiyskoye" has been cooperating with JSC "GC SHANECO" for several years in the context of various works in the field of engineering surveys.
In the period from 2022 to 2023, JSC "GC SHANECO" completed work on engineering and environmental surveys and documentation support for the facility "Mining and processing enterprise based on the tin ore deposit "Pravourmiyskoye". Underground mine with infrastructure."
During the engineering and environmental surveys, the necessary data were obtained to assess the impact of the planned, an assessment of the current state of the environment was made, and samples of all components of the natural environment were taken. Engineering surveys were carried out in a volume sufficient for the development of design and working documentation, and passing the state examination.
We note the high degree of personal responsibility of each specialist of your organization involved in this work, compliance with contractual deadlines, the shortest possible time for processing expert comments, effective interaction with the designer and the customer, the quality and information content of weekly reports and final documentation.
Based on the results of the review by the Federal Autonomous Institution "Glavgosexpertiza of Russia" of the technical report on engineering and environmental surveys as part of the design documentation set, a positive expert opinion was received.
During the work, JSC "GC SHANECO>> has proven itself as a professional Company. OOO "Pravourmiyskoye" thanks your company for the work done and recommends JSC "GC SHANECO" as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
General Director S. V. Antonov
-
In 2024, the Joint-Stock Company SHANECO Group of Companies (hereinafter referred to as JSC SHANECO Group of Companies) completed work on calculating greenhouse gas emissions from sources of objects with a negative impact on the environment of the Norilsk Obespechivayushchiy Kompleks Limited Liability Company (hereinafter referred to as the Customer, the Company).
The employees of JSC SHANECO Group of Companies demonstrated a high level of professionalism, close interaction with the Customer in the process of preparing the necessary initial data, and provided consulting support.
All work was completed on time, with high quality, the Company recommends JSC SHANECO Group of Companies as a contractor for similar work.
Acting Head of the Ecology Department Ya.V. Safonovа -
JSC "GC SHANECO" in 2023-2024 developed:
- inventory of sources of pollutant emissions into the atmosphere and a draft of Standards for permissible emissions of pollutants into the atmosphere for the object of the unauthorized environmental impact assessment of the Podgolechnoye mining and processing plant:
- a draft of Standards for permissible emissions of pollutants into the atmosphere for the object of the unauthorized environmental impact assessment of the Nizhneyakokitsky mining and processing plant.
The documentation was completed at a high level of quality. Both projects received positive expert and sanitary-epidemiological conclusions, as well as permits for emissions of pollutants into the atmosphere from the Office of Rosprirodnadzor in the Republic of Sakha (Yakutia).
We would like to especially note the flexibility and efficiency of the management and employees of SHANECO in resolving issues arising during the work, the ability to quickly respond to changes in legislation and find optimal solutions for the customer, thanks to which the cooperation was as productive and comfortable as possible.
We note JSC "GC SHANECO" as a reliable partner, open to cooperation, the level of professional training of the company's employees allows solving complex problems.
We recommend JSC "GC SHANECO" as a contractor for similar work, we note the high competitiveness of the company.
First Deputy General Director for Production N.V. Goncharov -
JSC "GC SHANECO" provided qualified consulting support during the commissioning of the Gold Recovery Plant at the Murzinskoye site. SHANECO's work included adjusting the "Environmental Protection Measures" section of the design documentation, including taking into account the clarifications received from the territorial office of Rosprirodnadzor, as a result of which the federal state environmental supervision body issued an environmental certificate of compliance (ECOZOS) for the capital construction project.
In addition, JSC "GC SHANECO" successfully completed work to obtain a Comprehensive Environmental Permit (CEP) for the Gold Recovery Plant at the Murzinskoye site (approved by the Order of the South Siberian Interregional Office of the Federal Service for Supervision of Natural Resource Management dated 01.07.2024 No. 1090-rd),
The work was completed with high quality within the scheduled time frame. We note the high readiness of the specialists of the SHANECO Group of Companies for constructive work with the customer and regulatory authorities, their focus on obtaining a positive result.
We recommend JSC "SHANECO Group of Companies" as a reliable partner and contractor for similar work.
Executive Director of OOO "Artel Prospectors Poisk" V.V. Olyunin -
JSC "GC SHANECO" in 2024, organized and held public discussions of the design documentation of the state environmental impact assessment facility "Underground mine at the Nerundinskoye gold deposit in the Severobaikalsk region of the Republic of Buryatia", including preliminary environmental impact assessment (EIA) materials.
Thanks to the professionalism and high qualifications of the specialists of JSC "GC SHANECO", the ability to work in close cooperation with the customer, all work was completed with high quality within the scheduled time frame.
We note JSC "GC SHANECO" as a reliable partner, open to interaction, the level of professional training of the company's employees allows solving complex problems.
We recommend JSC "GC SHANECO" as a contractor for similar work, we note the high competitiveness of the company.
Executive Director N.A. Garbuzov -
Our company would like to express its gratitude to the team of JSC "GC SHANECO" for the work on surveying noise sources for the production site of OOO "Agrotekhnologii" (393670, Tambov Region, Zherdevka, Neplanovaya St., 17A) including:
Inventory of noise sources, photo recording of noise sources with reference to the terrain.
Carrying out noise measurements on the territory of the production site and the adjacent residential area during operation in normal and maximum modes.
Drawing up a map of noise sources with determination of their actual sound power during operation in normal and maximum modes.
Determination of the degree of attenuation of the sound wave of the most powerful noise sources.
Drawing up a map of the propagation of sound waves in the adjacent residential area.
Preparation of a report including noise maps, noise measurement protocols and recommendations for reducing noise during equipment operation.
The work under the contract was completed promptly and within the time frame specified in the contract. During the work, the employees of JSC "GC SHANECO" were always in touch and answered all questions that arose.
As a result of the implementation of noise protection measures, the required result in reducing the noise level from the enterprise's sources was achieved.
OOO "Agrotekhnologii" recommends JSC "GC SHANECO" as a contractor for similar work.
Head of the department for processing and storing finished products
OOO "Agrotekhnologii" A.A. Zolotov -
In the period from 2020 to 2022, the company "SHANECO Siberia" performed Engineering and Environmental Surveys under a contract with the company Non-Commercial Partnership "Center for Environmental Assessment "Ecoline" for the facility "Baimsky GOK. Copper Deposit Project "Peschanka". Tailings Facility. (Chukotka Autonomous Okrug)".
We consider it necessary to note the high professionalism of the company's employees and the optimal technical equipment of the field and office groups, which made it possible to solve all the tasks set by the technical specifications in a short time and in difficult climatic conditions.
It should be especially noted that the company's employees made all adjustments and made all additions to the reporting documentation in a short time according to the wishes of the Customer and the General Customer of the work without references to the absence of requirements for the volume and form of presentation of materials in the technical specifications. These actions indicate a high customer focus of the company, the desire to obtain the final result, a positive expert opinion and provide the designers with the desired information for the design.
Director of the Non-Commercial Partnership
"Center for Environmental Assessment "Ecoline" Khotuleva M.V. -
In 2023-2024, JSC "GC SHANECO" provided environmental support for the development and examination of design documentation for a capital construction project: "JSC Stoilensky GOK" Drainage Mine. Construction of a natural quality wastewater drainage system into a surface water body" consisting of:
• preliminary environmental assessment;
• environmental impact assessment (EIA);
• public discussions on the planned activity;
• preparation of section 8 of the design documentation "Environmental Protection Measures";
• technical participation in the State examination of design documentation and survey results.
The well-coordinated work of JSC "GC SHANECO" specialists made it possible to receive a positive conclusion from the State examination within the established time frame without additional financial and time costs.
The employees of JSC "GC SHANECO" demonstrated a high level of quality work, efficiency in solving problems and focus on results.
NTC NOVOTEK LLC thanks the company for the work done and recommends JSC SHANECO Group as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
Director of NTC NOVOTEK LLC O.I. Pisarev -
JSC "GC SHANECO" in 2023-2024 developed industrial environmental control (IEC) programs for five objects of negative impact on the environment of the holding "Zoloto Seligdara":
• Mining and Processing Complex "Nizhneyakokitsky";
• Mining and Processing Complex "Podgolechnoye";
• Mining and Processing Complex "Samolazovsky";
• Mining and Processing Complex "Ryabinovy";
• Mining and Processing Complex "Lunnoye".
We note JSC "GC SHANECO" as a reliable partner, open to cooperation, the level of professional training of the company's employees allows solving complex problems.
We recommend JSC "GC SHANECO" as a contractor for similar works, we note the high competitiveness of the company.
General Director Tatarinov S.M. -
Ryabinovoye LLC expresses gratitude to the team of JSC SHANECO Group for the work performed in 2022-2024 at the Ryabinovoye Mining and Processing Plant, in particular:
• adjustment of the report on the inventory of stationary sources and emissions of pollutants into the atmosphere;
• development of a draft of standards for permissible emissions (SPE);
• obtaining a Sanitary and Epidemiological Conclusion on the SPE draft in the Office of the Federal Service for Supervision of Consumer Rights Protection and Human Wellbeing in the Republic of Sakha (Yakutia) and a Permit for Emissions of Pollutants into the Atmospheric Air in the Office of Rosprirodnadzor in the Republic of Sakha (Yakutia);
• development and approval of an action plan to reduce emissions of pollutants into the atmosphere during periods of adverse medical conditions in the Ministry of Ecology, Nature Management and Forestry of the Republic of Sakha (Yakutia).
The employees of JSC "GC SHANECO" demonstrated a high level of professionalism, close interaction with the Customer, and ensured prompt resolution of complex problems.
All work was completed in a timely manner, with high quality, OOO "Ryabinovoe" recommends JSC "GC SHANECO" as a contractor for similar works.
Director Tatarinov S. M.
OOO "Ryabinovoe" expresses gratitude to the team of JSC "GC SHANECO" for the preparation and approval of the sanitary protection zone project, conducting a risk assessment for public health and drawing up the Decision on the establishment of a sanitary protection zone with the entry of information about the sanitary protection zone in the Unified State Register of Real Estate for the Ryabinovoe Mining and Processing Plant.
The employees of JSC "GC SHANECO" demonstrated a high level of professionalism, close interaction with the Customer, and ensured prompt resolution of complex problems.
All work was completed in a timely manner, with high quality, OOO "Ryabinovoe" recommends JSC "GC A KO" as a contractor for similar works.
Director Tatarinov S. M. -
Our cooperation with the company Joint-Stock Company "Group of Companies SHANECO" (JSC "GC SHANECO"), continues from 2014 to the present. During this time, several large projects have been successfully completed. Throughout the entire period of cooperation, the company has established itself as a reliable business partner that demonstrates a high level of knowledge and experience in its field, which allows us to provide high-quality services for surveys. Attentive attention to detail and willingness to discuss any issues makes cooperation very comfortable. The surveys were completed on time and with the highest accuracy, which allowed us to successfully implement our projects.
Thanks to the main principle of the company's work - the formation of partnerships with clients based on professionalism and mutual cooperation, Joint-Stock Company "SHANECO Group of Companies" (JSC "SHANECO Group of Companies"), in our opinion, occupies a stable position in the field of surveys, and we can confidently recommend it as a reliable and proven partner for the implementation of projects requiring surveys!
We hope for further effective cooperation.
Sincerely,
General Director A. V. Sokolovsky -
JSC "SHANECO" provided JSC "Bystrinskaya Mining Company" with services for the development of working documentation for the sections of the KR KZh, EOM for the facility "BRU at the Kumroch field in the Ust-Kamchatsky district of the Kamchatka Territory".
As part of the services provided, the specialists of JSC "SHANECO" demonstrated a high professional level.
The work was completed efficiently and within the agreed time frame.
JSC "Bystrinskaya Mining Company" expresses gratitude to JSC "SHANECO" and hopes for further fruitful cooperation.
Sincerely,
Director of Design of JSC Bystrinskaya Mining Company Patlach Aleksandr Ivanovich
JSC SHANECO provided JSC Bystrinskaya Mining Company with services for adjusting space-planning and design solutions, materials of the PM OOS for the facility: "Construction of an input fuel and lubricants warehouse on the coast of the Kamchatka Gulf in the Ust-Kamchatsky District of the Kamchatka Territory" in connection with and in accordance with the implemented complex of scientific and technical support (STS) for the design and construction of a facility in a complex seismically hazardous area, in cooperation with scientific organizations involved by the Customer. As part of the services provided, the specialists of JSC SHANECO demonstrated a high professional level.
The work was completed efficiently and within the agreed time frame.
JSC Bystrinskaya Mining Company expresses gratitude to JSC SHANECO and hopes for further fruitful cooperation.
Sincerely,
Director of Design of JSC "Bystrinskaya Mining Company" Patlach Alexander Ivanovich -
In accordance with the terms of the Agreement for the provision of consulting services No. 0948 dated September 21, 2021, JSC "GC SHANECO" performed an environmental and social impact assessment (ESIA) of the casting and rolling complex (CRC) project of JSC "Uzmetkombinat" (Republic of Uzbekistan, Bekabad) in accordance with the standards of the International Finance Corporation, and also provided related services on environmental and social issues for the CRC project.
Under the agreement, SHANECO performed the following works:
● preliminary environmental and social assessment of the CRC project, preparation, assignments for conducting an environmental and social assessment;
● baseline studies;
● development and approval of the sanitary protection zone project of JSC "Uzmetkombinat";
● environmental and social assessment of the CRC project;
● preparation of the Environmental and Social Policy of JSC "Uzmetkombinat";
● a set of works on informing and interacting with stakeholders;
● development of Action Plans in the field of environmental protection, social responsibility, safety and health.
The specified works were performed in full compliance with the terms of the Technical Assignment within the specified time frame.
JSC Uzmetkombinat recommends JSC GC SHANECO as a reliable contractor with all the capabilities to perform similar works.
Deputy Chairman of the Board - Financial Director Budey T.A. -
AO "Shaneko" provided AO "Tin Ore Company" with services for the development of the CALCULATION OF PROBABLE DAMAGE THAT MAY BE CAUSED AS A RESULT OF THE ACCIDENT OF THE HYDRAULIC STRUCTURE "THE LANDFILL "DRY" LUBRICATION OF KEKA FILTRATION OF XBOCTOB SOLAR CONCENTRATION PLANT (SOF)".
As part of the services provided, AO "Shaneko" specialists demonstrated a high professional level.
The work was completed efficiently and within the agreed time frame.
AO "Tin Ore Company" expresses gratitude to AO "Shaneko" and hopes for further fruitful cooperation.
General Director, Head of the organization K.A. Kovalenko
AO "Shaneko" provided AO "Tin Ore Company" with services for the development of working documentation for the work of the 2nd stage of construction of the "DRY" STORAGE POLYGON OF KEKA FILTRATION OF XBOCTOB SOLAR PROCESSING PLANT (SOF)".
As part of the services provided, the specialists of AO "Shaneko" demonstrated a high professional level.
The work was completed qualitatively and within the agreed time frame.
AO "Tin Ore Company" expresses gratitude to AO "Shaneko" and hopes for further fruitful cooperation.
Director Kovalenko K. A. -
n 2023, JSC "GC SHANECO" completed work on organizing and conducting public discussions on the object of state environmental expertise - design documentation "PS 110 kV GNPS Payakha" with the 110 kV overhead power line "GTES Irkinskaya PS 110 kV GNPS Payakha" for the needs of Vostok Oil LLC, including preliminary OBOC materials.
Thanks to the professionalism and high qualifications of the specialists of JSC "GC SHANECO", the ability to conduct prompt and competent work in close cooperation with the customer, the successful completion of the public discussion procedure and subsequently obtaining a positive conclusion of the State Environmental Expertise were ensured.
We note JSC "GC SHANECO" as a reliable partner, open to interaction, the level of professional training of the company's employees, which allows solving problems of varying complexity.
We recommend JSC "GC SHANECO" as a contractor for similar work, we note the high competitiveness of the company.
Sincerely, Project Manager I.Yu. Likunov -
Inter PAO Engineering LLC has been cooperating with the SHANECO Group of Companies for over ten years. Over these years, AO GC SHANECO has proven itself to be a reliable professional partner, providing highly qualified support to Inter PAO Engineering LLC on a project in the Kaliningrad Region in terms of eco-analytical studies and measurements, public hearings and environmental support for large projects. All work was completed with due quality and within the established deadlines.
In 2023, professional support by AO GC SHANECO of design and survey work during the State Environmental Expertise gave the green light to the project for the construction of an energy facility in the harsh climatic conditions of the north of the Krasnoyarsk Territory.
Inter PAO Engineering LLC hereby thanks the AO GC SHANECO team for their long-term, professional work and recommends the company as a reliable partner in the field of design and survey work.
Deputy General Director I.I. Opalin -
SPb-Giproshakht LLC expresses gratitude to the team of SHANECO Siberia (branch of JSC SHANECO Group) for the high quality of engineering and environmental surveys performed in compliance with the deadlines for the work, for the high professionalism of the employees and their communication skills during the work on the project "Project for the development of the placer gold deposit of the Egdegkych stream, right tributary of the Baimka river (river l. 61-79.5)".
We recommend SHANECO Siberia - a branch of JSC SHANECO Group as a reliable partner.
We look forward to further cooperation.
General Director A.S. Stolov -
The Industrial Safety Directorate of AO MXK EuroChem thanks AO GC SHANECO for its active participation in the 1st Environmental Conference of the United EuroChem, which was held on November 14, 2023 in Moscow, for preparing professional reports and speaking on two topical issues:
1) The practice of obtaining a comprehensive environmental permit. Analysis of the causes of refusals and problems in the process of obtaining a comprehensive environmental permit;
2) Environmental expertise of design documentation for Category I facilities. Problem areas when passing the SEE.
A distinctive feature of the presented reports is not only their methodological compliance with modern legislative requirements of the Russian Federation, but also their practical significance for application at EuroChem Group enterprises.
The reports aroused keen interest and response from EuroChem Group specialists, and the experience that AO GC SHANECO shared with the professional community will be useful for business in its daily work.
Deputy General Director -
Director for Industrial
Safety O.V. Nikolaenko -
InEkA-consulting LLC expresses gratitude to SHANECO Group of Companies JSC for the high-quality and timely execution of engineering and environmental surveys for two projects: Bratsk Aluminum Plant, Environmental Reconstruction and Krasnoyarsk Aluminum Plant. Environmental Reconstruction, as well as successful support within the framework of the state environmental assessment and the Federal Autonomous Institution Main State Expertise of Russia in 2023.
Based on the results of interaction with your company, I would like to note the high qualifications of SHANECO Group of Companies JSC specialists participating in the projects, who demonstrated high professionalism during the work, which became the basis for the successful and logical completion of the projects.
InEkA-consulting LLC thanks you for your cooperation and recommends SHANECO Group of Companies JSC as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
Director Perfilyev E.E. -
In 2022-2023, JSC "GC SHA,NEKO" completed work to adjust the Design documentation taking into account the actually implemented solutions and support during the state environmental assessment for the facility: "Site for processing, disposal and neutralization of oil-containing waste" at JSC Gazpromneft-ONPZ. The main objective in adjusting the Design documentation was to bring the design documentation into line with the actually constructed facility, as well as to remove the order of Rosprirodnadzor and obtain an Environmental Conclusion on the compliance of the constructed facility with the design documentation. An Environmental Conclusion was received for the existing provision on the facility "Site for processing, disposal and neutralization of oil-containing waste" at JSC Gazpromneft-ONPZ, however, the order has not yet been lifted, due to the moratorium on inspections by Rosprirodnadzor. It should be noted that during the receipt of the Environmental Conclusion by Rosprirodnadzor, inconsistencies were identified in the design documentation regarding the locations of waste accumulation sites, the list of substances generated during bioremediation, and other technical typos in the documentation, which in turn was not critical for issuing the Environmental Conclusion.
For our part, we consider it necessary to note the significant volume (heaviness) of the files (especially the graphic part), which hinders prompt work with the documentation and the presence of information not related to the design object.
We consider it acceptable to post general information about the work performed on the object: "Site for processing, recycling and neutralization of oil-containing waste" on JSC Gazpromneft-ONPZ, the official website of JSC SHANECO Group of Companies in the version presented in the Appendix.
We note JSC SHANECO Group of Companies as a reliable partner, open to interaction, the level of professional training of the company's employees allows solving the tasks set.
Sincerely,
Deputy General Director for Fire Safety, Labor Protection, Civil Protection and Environmental Protection V.N. Generalov -
We would like to express our gratitude to JSC "GC SHANECO" for the work carried out to prepare and coordinate the sanitary protection zone project of the Branch of OOO Gazpromneft-SM "OZSM" (taking into account new data on the GIDP installation complex).
Thanks to the active participation of your company, the sanitary protection zone of the Branch of OOO Gazpromneft-SM "OZSM" was established and entered into the Unified State Register of Real Estate.
We would like to express special gratitude to the employees of SHANECO for their professionalism and flexible approach in carrying out these works, taking into account the opinion of the Customer at all stages of the work.
We note that this work has significantly reduced environmental risks in the design and construction of the hydroisodewaxing unit (GIDP) complex.
Head of the project office for the construction of the GIDP installation complex M.V. Skakun -
The management and specialists of Migrup Proekt LLC express their gratitude to GC Shaneko JSC for the high-quality and timely execution of work on adjusting the engineering and environmental surveys for the project of Lebedinsky GOK JSC. Processing plant. Tailings facility. Sludge and rock systems section. Thickener No. 1" in 2022 and successful support within the framework of the state environmental assessment and the Federal Autonomous Institution "Glavgosexpertiza of Russia" in 2023.
We hope for further constructive and fruitful cooperation.
General Director Babich N.A. -
JSC "SHANECO Group" provided JSC "Bystrinskaya Mining Company" with services for the development of design documentation for the facility: Construction of a mining and processing plant at the Kumroch deposit in the Ust-Kamchatsky municipal district of the Kamchatka Territory. 1st stage. Infrastructure facilities. Section 5. Information on engineering equipment, on engineering and technical support networks, a list of engineering and technical measures, the content of technological solutions. Subsection 2. Water supply system. Calculation of the standard water consumption and the volume of water for external fire extinguishing
As part of the services provided, the specialists of JSC "SHANECO Group" demonstrated a high professional level.
The work was completed efficiently and within the agreed time frame.
JSC "Bystrinskaya Mining Company" expresses gratitude to JSC "SHANECO Group" and hopes for further fruitful cooperation.
Chief Project Engineer I.V. Alekseev -
JSC Zoloto Seligdara expresses gratitude to the team of JSC GC SHANECO for the work on the preparation, approval of the sanitary protection zone project, conducting a risk assessment for public health and obtaining the Decision on the establishment of the sanitary protection zone for the production site of the Nizhneyakokitsky Mining and Processing Complex.
The employees of JSC GC SHANECO demonstrated a high level of professionalism, close interaction with the Customer, prompt response to urgent tasks, including at the stage of project approval.
JSC Zoloto Seligdara recommends JSC GC SHANECO as a contractor for similar work.
Head of the Ecology Department S.V. Dmitrieva -
ITPI LLC, based on the results of cooperation within the framework of the project "Performing engineering surveys and developing a project for recultivation of the contaminated territory of FSUE "PO "KHK "YENISEI"" and Contract No. 1026 dated October 28, 2022, sends feedback on the work performed:
The Analytical Center of JSC "SHANECO Group" for the first time provided services for laboratory testing of soil and soil samples for LLC "ITPI".
The work was carried out in an extremely short time, the employees of the AC of JSC "SHANECO Group" proved themselves as competent and responsible specialists, fulfilling their obligations on time and at the appropriate level of quality.
The samples were tested at a high technical level using modern equipment and technologies in accordance with the methods.
Issues arising in the course of work were resolved promptly, comments were immediately eliminated.
LLC "ITPI" thanks the Analytical Center of JSC "SHANECO Group" for cooperation and recommends to perform similar work.
General Director M.V. Gagarin -
In accordance with the terms of the Agreement No. AGRP-9-22 dated 09/19/2022, SHANECO Group JSC dated technogenic formations on the license area of BLG 03380 BE (Amur Region, Tynda district).
As part of the work under the contract, a set of studies was carried out.
LLC Amur Geological Exploration Enterprise recommends SHANECO Group JSC as a reliable contractor with all the capabilities to perform similar work.
General Director M.G. Shmonov -
SHANECO Group JSC is a long-standing partner of our company, has repeatedly performed work on environmental support for the reconstruction of the existing plant and the construction of new production facilities.
The prompt inclusion of your company in these projects made it possible to minimize the risks of expert opinions, to ensure the implementation of the design schedule.
JSC "Vyksa Metallurgical Plant" thanks your team for the high-quality and timely performance of these services and recommends SHANECO Group JSC as a performer of similar works.
Director of Production Safety V.I. Ageev
-
EVRAZ has been cooperating with SHANECO Group JSC for several years in the framework of various works in the field of environmental protection: the development of an EIA, public discussions, support of the state environmental expertise, the development of the SPZ project and its approval, the audit of the water supply and sanitation system of the enterprise, etc.
We would like to express our gratitude to the entire SHANEСO team for their efficiency, clarity, quality, professionalism, absolute reliability and willingness to help almost 24/7. Despite the fact that our projects were far from the only ones you have, we have never heard that you are tired, overloaded and you are not up to us right now. Thank you for such a high customer focus! This is the incredible work of each team member and the business culture formed in the company!
Director of the Directorate for the Coordination of Environmental Activities EVRAZ M.A. Epifantsev -
JSC "SHANECO Group" carried out work on the development and approval of the draft waste generation standards and limits on their placement (PNOOLR) for JSC "Gazpromneft - MNPZ". Based on the results of the work, a document was received on the approval of waste generation standards and limits on their placement in regulatory state bodies.
During the work, JSC "SHANECO Group" has proved itself as a professional company, employees have shown a high level of quality of work; efficiency in solving tasks, both at the stage of development of project documentation, and when "its technical support in specially authorized bodies.
JSC Gazpromneft - MNPZ thanks your company for the work done and recommends JSC "SHANECO Group" as a reliable partner in performing similar work.
Deputy General Director for Industrial Safety A.V. Galyautdinov -
JSC "SHANECO Group" carried out work on the development and coordination of the project of the sanitary protection zone of the Industrial hub of the Branch of LLC "HeidelbergCement Rus" in Novogurovsky with the inclusion of a new object - the Verkhneyashevsky subsoil plot and the change of the boundaries of the mining branch of JSC "Gurovo-Concrete" taking into account the construction of a NOx emission reduction system.
Based on the results of the work, a decision was made to establish a sanitary protection zone of the facility; information about the boundaries of the SPZ was entered in the EGRN.
During the work of JSC "SHANECO Group", passing examinations and receiving a decision on changing the SPZ, employees showed a high professional level, efficiency in solving tasks, including at the stage of technical support of project approval, the ability to make decisions quickly to achieve the goals set
The branch of LLC "HeidelbergCement Rus" in the village of Novogurovsky thanks JSC "SHANECO Group" for cooperation and recommends to perform similar work
Director of the branch of LLC "HeidelbergCement Rus" in the village of Novogurovsky I. Weiss -
JSC "Vyksa Metallurgical Plant" thanks the staff of SHANECO Group JSC for the high-quality and timely execution of environmental risk assessment work within the framework of the Development Concept of the Foundry and Rolling Complex Division of oil and gas pipeline pipes of JSC "VMZ".
The work was carried out at a high professional level, all significant environmental aspects of the planned activity were analyzed, measures were proposed to ensure environmental quality standards.
Production Safety Director A.V. Pivikov
-
In 2021, the Krasnoyarsk branch of "SHANECO Siberia" JSC "SHANECO Group" carried out research and assessment of the radiation situation within the framework of engineering and environmental surveys for the object "Development of project documentation for the construction of an underground water intake at the Kitoisk underground water field for the water supply of the population of the Angarsk city district"".
The specialists of the Krasnoyarsk branch of "SHANECO Siberia" performed a complex of field observations, laboratory studies and compiled a report in accordance with the issued assignment.
The entire complex of radiation studies was carried out in full compliance with the requirements of regulatory documents, in a timely manner.
We note the high reliability of observations, thoroughness of study, analysis and generalization of the results obtained, competent design of reporting materials.
We thank the Krasnoyarsk branch of "SHANECO Siberia" JSC "GC SHANECO" for fruitful cooperation. We especially note the high qualification of the branch's specialists.
JSC "Krasnoyarsk Institute of Vodokanalproekt" recommends the Krasnoyarsk branch of "SHANECO Siberia" JSC "SHANECO Group " as a qualified performer of similar works.
General Director G.V. Krasavin
-
The management and specialists of Migroup Project LLC express their gratitude to JSC "SHANECO Group" for the high-quality and timely execution of work on the adjustment of engineering-hydrometeorological and environmental surveys under the project of JSC Lebedinsky GOK. Processing plant. Tailgating workshop. Section of sludge and rock systems. Thickener No. 1" in 2021 and successful support within the framework of the state environmental assessment and the FAA "Glavgosekpertiza of Russia" in 2022.
We hope for further constructive and fruitful cooperation.
General Director N.A. Babich -
We express our gratitude to JSC "SHANECO Group" for the work performed on the provision of consulting services on the topic: Development of the calculation of the dispersion of pollutants, technical support of the State Environmental Assessment and the Main state examination of the facility "General Factory flare system. Flare system of HFC" (Stage 4) for the needs of Gazpromneft-ONPZ JSC.
Thanks to the professionalism and high qualification of the specialists of JSC "SHANECO Group", the ability to conduct prompt and competent work in a team in close cooperation with the customer and the project organization, positive conclusions of the State Environmental Expertise and the Main State Expertise on the object were provided.
JSC "SHANECO Group" is a reliable partner when performing assigned tasks in the design process, the level of professional training of the company's employees allows solving tasks of any complexity.
Acting Head of the project office for the implementation of the project to bring the factory-wide flare system up to standards A.Y. Kuznetsov -
Within the framework of the "Project of substantiation of the size of the calculated sanitary protection zone for the object: "Udokan Mining and Metallurgical Combine". The first stage of construction for a capacity of 12.0 million tons of ore per year"" JSC "SHANECO Group" developed a project of a sanitary protection zone, including an assessment of the risk to public health, received expert and sanitary-epidemiological conclusion, as well as a decision on the establishment of a sanitary protection zone.
During the development of the project, carrying out examinations in the Center of Hygiene and Epidemiology in the Trans-Baikal Territory and in the Department of Rospotrebnadzor in the Trans-Baikal Territory, as well as when receiving a Decision on the establishment of a SPZ in the Federal Service of Rospotrebnadzor, the employees of JSC "SHANECO Group" proved to be high professionals capable of working in a team with the customer and design organizations, promptly solve complex problems and find solutions acceptable to the customer in a short time.
LLC "Udokan Copper" thanks for the cooperation and recommends JSC "SHANECO Group" as a reliable partner when performing similar work.
Design Director K.A. Shapovalov -
From February 2021 to March 2022, JSC "SHANECO Group" conducted laboratory work on objects for the Joint Stock Company "State Specialized Design Institute" (JSC "GSPI").
The work was completed on time. We look forward to further cooperation with your organization.
Head of ILRK JSC "GSPI" F.P. Zubrilin -
As part of the work on updating the passports of the improvement of the territory of Gazpromneft-MNPZ JSC, JSC "SHANECO Group" performed work on the survey of the territory, updating inventory plans and list lists, entering data into the AIS "Register of green spaces", approval of the passports of improvement in the Housing and communal services of Moscow and Department of Environmental Management and Environmental Protection of Moscow.
JSC "SHANECO Group" has been our partner for more than 5 years. During the work, the employees of JSC "SHANECO Group" have shown high qualifications and professionalism.
Landscaping passports have been developed in strict accordance with the regulatory requirements in the field of protection of green spaces and landscaping of Moscow, the technical requirements of AIS "Register of green spaces".
Our company was satisfied with the cooperation with JSC "SHANECO Group" and recommends it as a reliable contractor when performing similar types of work.
Deputy General Director for Industrial Safety A.V. Galyautdinov -
JSC "SHANECO Group" provided LLC Industrial Group "Phosphorit" services for the development of the concept of further use of the existing warehouse / storage of fssfogips at the industrial site of LLC "Industrial Group Phosphorit".
As part of the services rendered, the Company's experts demonstrated a high professional level. The work was done efficiently and on time.
We look forward to further cooperation with your organization.
Technical Director V.I. Degtyarev -
The Ecoline Center for Environmental Assessment non-profit partnership expresses its gratitude to SHANECO GC JSC for the work performed on the project “Performance of certain types of studies as part of engineering and environmental surveys at the facility: “Overhead power line and access road to the licensed area of the Fedorova Tundra deposit” .
Preparatory, field, cameral and laboratory-analytical work within the framework of the project was carried out at a high professional level, in compliance with the established deadlines. Reporting materials are provided in full and in strict accordance with the terms of reference.
When fulfilling contractual obligations, the employees of SHANECO Group of Companies JSC demonstrated a high level of professional competencies and the ability to quickly solve problems in difficult production situations.
The non-profit partnership Ecoline Center for Environmental Assessment recommends SHANECO Group JSC as a reliable partner in carrying out engineering and environmental surveys.
Director M.V. Khotuleva
-
We hereby express our gratitude to JSC SHANECO Group of Companies for the work performed to adjust the design documentation for the facility “Delayed coking unit of JSC Gazpromneft-ONPZ”
Representatives of SHANECO Group of Companies JSC involved in this project proved to be professionals of the highest level, providing the highest level of quality, able to quickly solve the tasks set, using a proactive approach and flexibility in making responsible decisions both at the stage of developing documentation and during its support in expert organizations. The result of such work is obtaining a positive conclusion from the State Ecological Expertise.
We thank SHANECO Group JSC for cooperation and wish you to reach new heights!
Head of the DKP project office A.V. Zhayvoronok
-
Within the framework of the agreement No. 0845 dated 16.08.2019, SHANECO Group JSC in 2019-2021 performed a set of works on engineering surveys and environmental support for the preparation of project documentation for the reconstruction of the mine "Mnogovershinny" (Khabarovsk Territory, Nykolaiv district, Mnogovershinny), including:
- environmental impact assessment studies, including public discussions of the planned activities;
- carrying out engineering and hydrometeorological (including works on microclimatic modeling and assessment of hazardous hydrometeorological processes) and engineering and environmental surveys;
- technical participation in the State examination of the results of engineering surveys.
The surveys were carried out at the sites of the operating mining enterprise, which formed special requirements for the organization of work and ensuring the requirements
of industrial safety and labor protection.
According to the results of the review of the materials of engineering-hydrometeorological and
engineering-environmental surveys of the FAA "Glavgosexpertiza of Russia", a positive conclusion was obtained.
LLC "ID Engineers" thanks SHANECO Group JSC for cooperation and organization of work.
General Director E.I. Kolesnikov -
Within the framework of the agreement No. 0935 dated 12.05.2021 SHANECO Group JSC and the Institute of Geochemistry of the Russian Academy of Sciences named after V.I. Vernadsky, a geochemical forecast of quarry and basement waters was made to substantiate the design solutions of the Chernogorsky GOK, which included:
- preparation of a permanent computer model of chemical interactions in the "water-rocks" system of the Chernogorsky deposit;
- assessment of the extraction of normalized chemical elements from the main types of rocks of the Chernogorsky deposit during the formation of sub-basement and quarry runoff.
The work was carried out in full compliance with the Terms of Reference. At the stage of acceptance of the simulation results, SHANECO specialists interpreted the data obtained, ensuring the preparation of the technological scheme for the treatment of the corresponding effluents.
Deputy General Director for Engineering and Project Management S.L. Sergienko -
JSC "Uralgipromez" carries out the design of the production complex V205 of LLC "EVRAZ Uzlovaya", located in the Tula region, Uzlovsky district, SEZ "Uzlovaya".
SHANECO Group was involved in the role of a developer of materials for environmental impact assessment and the project of a sanitary protection zone.
According to the results of the state environmental assessment and the main state examination of the project documentation carried out taking into account the results of the EIA and the SPZ project, positive conclusions were obtained.
We express our gratitude for the work done. Our company highly appreciate the professionalism of your employees, their level of competence and interest in the successful implementation of the project.
General Director S. Yu/ Kulakov -
With this letter, OMK JSC expresses its gratitude to SHANECO Group JSC for the high-quality work performed on the examination and assessment of environmental risks associated with the wastewater of the OMK enterprise.
During the performance of contractual obligations, SHANECO Group JSC has proved itself as a responsible professional team, employees have demonstrated a high level of competence and efficiency in solving tasks defined by the terms of reference. The reporting materials are provided within the contractual terms and meet the requirements of the terms of reference.
JSC " OMK "thanks for the cooperation and recommends SHANECO Group JSC as a reliable partner in the performance of similar work.
Director for Investments and New Projects D. A. Filichev
-
JSC "SHANECO GROUP" carried out work on the development and approval of the project of the sanitary protection zone of the production site of LLC "Solid-Kama", located at the address Moscow, Khoroshevskoe highway, bld. 32A.
Based on the results of the work, a decision was made to establish a sanitary protection zone of the object. During the work, JSC "SHANECO GROUP" proved itself as a professional Company, the employees showed a high level of quality of work; efficiency in solving problems at the stage of technical support of coordination with expert organizations.
LLC "SZ "KHOROSHEVSKY" thanks for the cooperation and recommends JSC "SHANECO GROUP" as a reliable partner in the performance of similar work.
Project Manager O.O. Shevchuk -
JSC "SHANECO GROUP" (hereinafter referred to as the Company) provided consulting services to GPB Bank (JSC) as part of the environmental assessment of the project to create four plants for the thermal disposal (incineration) of solid municipal waste in the Moscow region (hereinafter referred to as the Project).
As part of the services provided, the Company's experts demonstrated a high professional level. The work was done efficiently and on time.
I express my gratitude to the Company's team for their cooperation on the Project and hope for further fruitful cooperation in the future.
Executive Vice President-Head of the Department of Infrastructure Projects and Public-Private Partnership P. A. Brousser -
From November 2020 to January 2021, JSC "SHANECO GROUP" conducted laboratory work for JSC "GSPI" on the object: "A low-power nuclear power plant with a RITM-200 reactor plant on the territory of the Nyazepetrovsky district of the Chelyabinsk region". The work was completed on time. We look forward to further cooperation with your organization.
Head of ILEK F.P. Zubrilin -
As part of the work on updating the passports of improvement of the territory of Gazpromneft-MNPZ JSC "SHANECO GROUP" carried out work on the survey of the territory, updating inventory plans and list lists, entering data into the AIS "Register of Green Spaces", approving the passports of improvement in the DKZHH of Moscow and the DPiOOS of Moscow.
JSC "SHANECO GROUP" has been our partner for more than 5 years. During the work, the employees of JSC "SHANECO GROUP" showed high qualification and professionalism.
Landscaping passports are developed in strict accordance with the regulatory requirements in the field of protection of green spaces and landscaping in Moscow, the technical requirements of the AIS "Register of Green Spaces".
Our company was satisfied with the cooperation with JSC "SHANECO GROUP" and recommends it as a reliable contractor when performing similar types of work.
Deputy General Director for Industrial Safety A.V. Galyautdinov -
LLC "Projects and Technologies-Ural Region" expresses its gratitude to the management and staff of JSC "SHANECO GROUP" for the work performed on the preparation of sections of the project documentation and environmental support of the project "Opening and development of deep horizons of the Sentachan field", including for the development and approval of the project of the sanitary protection zone (SPZ) for this object.
JSC "SHANECO GROUP" proved itself as a professional Company, whose employees showed a high level of quality of work, efficiency in solving problems, both at the stage of development of project documentation, and when it is supported in control and expert organizations.
The result of the joint work of our Team was the receipt by the Subsurface User of a positive sanitary and epidemiological conclusion on the SPZ project, the conclusion of the State Environmental Expertise and the conclusion of the FAA "Glavgosexpertiza of Russia" on the specified project documentation within the standard time frame.
LLC "Projects and Technologies-Ural Region" thanks your Company for cooperation and recommends JSC "SHANECO GROUP" as a reliable partner when performing similar work.
General Director A.V. Shirokov -
As part of the work on monitoring the noise level at the border of the sanitary protection zone for the Primorskaya TPP of the Kaliningrad TPP-2 branch of Inter RAO - Electric Generation JSC during the 4th quarter of 2020. The analytical center of JSC "SHANECO GROUP" carried out measurements of noise levels in accordance with the requirements of MUC 4.3.2194-07-Control of noise levels in residential areas, in residential and public buildings and premises and GOST 23337-2014 - Methods for measuring noise in residential areas and in residential and public buildings.
The measurements were carried out in strict accordance with the requirements of the technical specification and regulatory documents within the established time frame.
We recommend the Analytical Center of JSC "SHANECO GROUP", accredited by the FSA, as a contractor for performing similar work.
Technical Director-Chief Engineer S.A. Makovsky
-
As part of the work on monitoring the noise level at the border of the sanitary protection zone of JSC "MOSKOKS" during 2020. The analytical center of JSC "SHANECO GROUP" carried out measurements of noise levels in accordance with the requirements of MUC 4.3.2194-07-Control of noise levels in residential areas, in residential and public buildings and premises and GOST 23337-2014 - Methods for measuring noise in residential areas and in residential and public buildings.
The measurements were carried out in strict accordance with the requirements of the technical specification and regulatory documents within the established time frame.
We recommend the Analytical Center of JSC "SHANECO GROUP", accredited by the FSA, as a contractor for performing similar work.
Head of the Department for Environmental Safety of JSC "MOSKOKS" T.S. Plotnikova
-
The objects of the Mining and metallurgical complex are located in a poorly studied and inaccessible area with difficult natural and climatic conditions. Performing research in such a region requires professionalism and non-standard solutions.
In 2020, JSC "SHANECO GROUP" successfully completed survey work on projects for the construction of a Transport and warehouse complex, a water intake and inter-site networks, an access road and the connection of a non-public railway track of LLC "Baikal Mining Company" to the infrastructure of the East Siberian Railway at the Novaya Chara station for the Mining and Metallurgical complex, and received positive conclusions of architectural and construction expertise.
General Director G.S. Mironov -
JSC "Tin mining company" expresses gratitude to the management and staff of JSC "SHANECO Group" for the performed works on development and coordination of the project "Polygon "dry" storage of the cake filtration tailings Solar concentrator (SOF)".
JSC "Tin mining company" thanks for your cooperation and encourages JSC "SHANECO Group" as a reliable partner.
Executive Director N. N. Naumov -
In 2017-2019, the analytical center of JSC "SHANECO Group" measured noise levels in accordance with the requirements of GOST 22283-2014 "Aviation noise".
Acceptable noise levels in residential areas and methods of measuring it" in the framework of the assessment of acoustic impact on residential areas in the city of Zhukovsky, Moscow region.
The measurements were made in accordance with the requirements of the technical specification and regulatory documents within the established time frame.
LLC "NCA" recommends the analytical center of JSC "SHANECO Group", accredited by the Federal accreditation service, as a contractor for performing similar works.
General Director T.I. Aleksanyan
-
JSC "VNIIEM Corporation" has a successful experience of cooperation with JSC "SHANECO GROUP" on the development of a project for a sanitary protection zone for production site No. 2 located at 30 Volnaya street, Moscow, as part of the implementation of the requirements of the decree of the Government of the Russian Federation No. 222 of 03.03.2018.
The development of the SPZ project was completed to the extent that allowed us to obtain a Decision on the establishment of a sanitary protection zone of the Federal service for supervision of consumer rights protection and human welfare in the city of Moscow.
During the work, JSC "SHANECO GROUP" has proved itself as a professional company, employees have shown a high level of quality of work, efficiency in solving problems at the stage of technical support of coordination with expert organizations.
JSC "VNIIEM Corporation" thanks for the cooperation and recommends JSC "SHANECO GROUP" as a reliable partner when performing similar works.
Chief engineer P. Solopov
-
As part of the project for the construction of a deep oil refining Complex on the territory of the Moscow oil refinery, JSC "SHANECO GROUP" developed and agreed with the Department of Rospotrebnadzor for Moscow The project of the sanitary protection zone (SPZ) of JSC "Gazpromneft-MNPZ" (adjustment to the projected SPZ)."
Thanks to the cohesive work of our teams in a timely manner the Customer received the desired results of high quality and good work of personnel with Supervisory bodies allowed us to obtain sanitary-epidemiological conclusion for the successful completion of the State examination.
The SHANECO team is attentive to the needs of the Customer, timely informs about the identified risks and offers measures to eliminate them, participates in technical meetings and offers the Customer the most optimal ways to solve problems.
JSC "NIPIGAZ" expresses its gratitude to the staff of JSC "SHANECO GROUP" for the work performed, hopes for further fruitful cooperation and recommends SHANECO as a performer.
Director,
Krasnodar engineering center A. Fedosov
-
JSC "SHANECO GROUP" has proved itself as a professional Company, whose employees have shown a high level of quality of work, efficiency in solving problems, both at the stage of development of project documentation, and during its technical support in control and expert organizations.
The result of the joint work of our Team was the receipt by the subsoil User of a positive Conclusion of the FAA "Glavgosexpertiza of Russia" on the specified project documentation within the regulatory period.
LLC "NPO UGGU" thanks Your Company for cooperation and recommends JSC "SHANECO GROUP" as a reliable partner when performing similar works.
General Director S. Isakov -
CJSC "International Paper" thanks JSC "SHANECO GROUP" for the work done to analyze previously developed design solutions for the rehabilitation of the territory of the former "chlorine plant" site contaminated with mercury, the adjacent section of the water area of the river Unternisk, as well as for the analysis of the market for relevant services and the preparation of alternative proposals for the rehabilitation of mercury pollution sites.
CJSC "International Paper" is satisfied with the cooperation with JSC "SHANECO GROUP", describes the employees of JSC "SHANECO GROUP"as competent and responsible professionals.the Work of JSC "SHANECO GROUP" was completed on time and with proper quality.
CJSC "International Paper" thanks for the cooperation of JSC "SHANECO GROUP".
Deputy Director of the Department A. Vedernikov
-
JSC "SHANECO GROUP" has been our partner for more than 5 years. During the work, the employees of JSC "SHANECO GROUP" have shown high qualification and professionalism.
Landscaping passports are developed in strict accordance with the regulatory requirements in the field of protection of green spaces and landscaping in Moscow, the technical requirements of the AIS "Register of green spaces".
Our company was satisfied with the cooperation with JSC "SHANECO GROUP" and recommends it as a reliable contractor when performing similar types of work.
Deputy General Director for industrial safety A. Zakharov -
"NPF EITEK" LLC thanks JSC "SHANECO GROUP" for its work on the drafting of the SPZ and the boundary of the SPZ branch of LLC "Gazpromneft-SM" "OZSM" given the projected installation FOREHEADS GIDP.
The work of JSC "SHANECO GROUP" was completed on time and with proper quality, which allowed us to obtain a positive Conclusion of the Main state examination of the project documentation and the results of engineering surveys.
Employees of JSC "SHANECO GROUP" have extensive experience, professional competence and advise the customer on emerging issues. We are especially grateful to Irina Madatova.
"NPF EITEK" LLC is fully satisfied with the cooperation with JSC "SHANECO GROUP" and hopes for further joint work in promising projects.
General Director I. Pozdnyakova
-
JSC “VMZ” thanks the staff of JSC “SHANECO Group” for the promptness and professionalism shown in the development of the draft sanitary protection zone and the establishment of the sanitary protection zone of our enterprise.
Work on the establishment of the boundaries of the sanitary protection zone of JSC "VMZ" was completed in full and with appropriate quality.
The competence and responsibility shown by employees in carrying out work to establish the boundaries of the SPZ allowed us to achieve our goals.
JSC "VMZ" appreciates the partnership with JSC "SHANECO Group" and hopes to continue further cooperation.
Production safety Director A. Pivikov -
During the work of JSC "SHANECO Group" proved itself as a professional Company, the staff showed a high level of quality of work; efficiency in solving problems at the stage of technical support coordination with expert organizations.
Chief engineer of the property management Department A. Kuzmin
-
As part of the implementation of the resolution of the government of Moscow dated August 21, 2018 No. 960-PP JSC "SHANECO Group" performed work on the confirmation of compliance with hygienic standards for LLC "RG-development".
Head of technical customer Department A. Shtyrev
-
JSC "Gazpromneft-MNPZ" expresses gratitude to the staff of JSC "SHANECO Group" for the quality performance of contractual obligations to perform work under the project " Assessment of air pollution from emergency emissions of flare installations MNPZ (taking into account the possible prospects of development).
Deputy General Director for industrial safety R. Romanov -
The work on establishing the boundaries of the SPZ of the Branch of LLC Gazpromneft-SM ozsm was performed in full and with proper quality.
Competence and responsibility shown by employees in the performance of work on the establishment of the boundaries of SPZ, allowed to achieve the goals of the customer.
The branch of Gazpromneft-SM OZSM LLC appreciates partnership with SHANECO GROUP JSC of companies and hopes for continuation of further cooperation.
Branch Director V.M. Chugunov