In 2024, JSC SHANECO Group organized and completed work on developing site planning documentation for the construction of the linear facility "Reconstruction of 220 kV Overhead Line Approaches at the 220 kV Chara Substation" at the Udokan Mining and Metallurgical Plant. Phase I of Construction.
Thanks to the professionalism and high qualifications of JSC SHANECO Group specialists, and their excellent communication with the Client and authorized bodies, all work was completed with high quality and within the scheduled timeframe.
We recognize JSC SHANECO Group as a reliable partner open to collaboration. The level of professionalism of the company's specialists enables them to tackle complex and ambitious tasks.
We recommend JSC SHANECO Group as a contractor for similar projects, acknowledging the company's high competitiveness.
We also inform you that Udokanskaya Med LLC prohibits the publication of news about the Company's projects on your company's official website or other media resources.
Director of Design Management N.A. Varygina -
Dear Ekaterina Vladimirovna!
During our collaboration with ITPI LLC, SHANECO Group of Companies has established itself as a reliable business partner, and the Analytical Center, as an accredited laboratory, demonstrates its competence in laboratory research (testing) and measurements.
The Analytical Center's accreditation covers a wide range of research and measurement methods. Modern technical equipment and qualified, competent, and impartial laboratory personnel ensure the quality of the services provided.
Laboratory measurements conducted by the Analytical Center were completed within the assigned scope, in a timely manner, and in full. The results were documented and presented in compliance with the required standards and methodologies. Interaction with the company is organized effectively, and the company's employees ensure prompt resolution of production issues.
ITPI LLC expresses its gratitude to the Analytical Center of JSC
SHANECO Group of Companies for their professionalism and high-quality services in
measuring physical factors affecting environmental objects and radiation monitoring.
We look forward to further cooperation.
Head of the Analytical Laboratory Sokolova L.A. -
In 2024–2025, JSC GC SHANECO performed engineering surveys for the Udokan Mining and Metallurgical Plant. The first phase of construction has a capacity of 12.0 million tons of ore per year. The Western Main Dam (U1.TK.05.02.05, inventory number ER-006306) and the Cascade Dam System (U1.TK.05.02.08) were completed on time and in compliance with current regulatory requirements. The company's specialists demonstrated a high level of organization and competence, as well as a careful attention to the client's interests.
Udokanskaya Med LLC expresses its gratitude to JSC GC SHANECO and recommends the company as a contractor for similar work.
N.A. Varygina, Director of Design Management -
We have been cooperating with Joint-Stock Company "SHANECO Group of Companies" (JSC "SHANECO Group of Companies") since 2017.
During this time, JSC "SHANECO Group of Companies" has established itself as a reliable business partner. Thanks to the high level of knowledge and experience of the SHANECO team, Udokanskaya Med LLC always receives high-quality services in the field of engineering surveys.
We particularly appreciate your specialists' attention to detail and willingness to discuss any issues, making our collaboration very fruitful.
As part of the "Udokan Mining and Metallurgical Plant. Phase I of Construction with a Capacity of 12.0 Million Tons of Ore Per Year. Tailings Facility. Northern Dam" project, JSC "SHANECO Group of Companies" demonstrated its professionalism, high quality workmanship, efficiency, and a focus on results. Udokanskaya Med LLC confidently recommends SHANECO Group JSC as a reliable and proven partner for the implementation of the most complex projects.
We look forward to continued successful cooperation!
N.A. Varygina, Director of Design Management -
OOO Khvoynoye thanks your company for performing a set of engineering surveys, developing design and working documentation, as well as conducting an environmental impact assessment, developing and coordinating a sanitary protection zone project for the construction of the Industrial Waste Landfill of the Khvoynoye Mining and Processing Plant.
The specialists of JSC GC SHANECO demonstrated the necessary competencies, the ability to work in a team, focus on results and the ability to find optimal solutions in difficult situations.
We would like to express special gratitude to the project manager in terms of environmental support O.A. Uvarov, project curator E.S. Leonova, deputy general director, project manager in terms of engineering surveys L.V. Moskvitina, for their professionalism, perseverance, effective interaction and communication, compliance with deadlines and deadlines, creativity and an original, responsible approach to the performance of work.
The documentation was prepared in accordance with the established requirements, successfully passed the review of authorized bodies, incl. State Ecological and Main State Expertise, the sanitary protection zone of the landfill was established.
All work was completed on time, with the required quality.
We recommend JSC "GC SHANECO" as a reliable partner when performing similar work.
We hope for fruitful cooperation in the future.
General Director I.Yu. Kulikov -
In 2024, JSC "GC SHANECO" successfully completed work for the Novolipetsk Iron and Steel Works to adjust the design documentation in connection with the clarification of design solutions for the capital construction project: "PAO SHGSCH. Construction of an auxiliary facility for the KHP sludge management, D-1" as part of the adjustment:
• environmental impact assessment (EIA) materials;
• design documentation "Environmental protection measures" (M00S).
The work was carried out efficiently and on time.
The specialists of JSC "GC SHANECO" demonstrated a high level of professionalism, efficiency in solving problems and focus on results.
JSC "MEKHANOBR ENGINEERING" thanks the company for the work done and recommends JSC "GC SHANECO" as a reliable partner when performing similar tasks.
We hope for further constructive and fruitful cooperation.
Sincerely,
Chief Project Engineer Z.S. Rogalev -
During the cooperation, JSC "GC SHANECO" has established itself as a reliable partner. The high level of knowledge and extensive experience of SHANECO specialists allowed us to receive high-quality engineering survey services. Attentive attitude to details and willingness to discuss any issues made the cooperation very comfortable.
JSC "TSG Asacha" expresses gratitude to JSC "GC SHANECO" for their professionalism, efficiency in solving problems, ability to work in a team and focus on results when performing work on the project "Mining and processing enterprise at the Asachinskoye deposit. Zhila 25
JSC "TSG Asacha" can confidently recommend JSC "GC SHANECO" as a reliable and proven partner for the implementation of projects of any complexity!
We hope for further constructive and fruitful cooperation.
Head of the Technical Department
On behalf of JSC "TSG Asacha"
Representative by power of attorney No. ХГ- 109 dated 12/25/2024 A.S. Brick -
AO "GC SHANECO" performed work on technical support for entering information about the sanitary protection zone of AO "Gazpromneft-MNPZ" into the Unified State Register of Real Estate.
We note the efficiency of the management and specialists of AO "GC SHANECO" in resolving issues during the work process and in interaction with employees of Rospotrebnadzor and Rosreestr.
As a result of the work done, the set goals were successfully achieved: the sanitary protection zone of AO "Gazpromneft-MNPZ" is displayed on the public cadastral map.
We recommend AO "GC SHANECO" as a contractor for similar work, we note the company as a reliable partner ready to solve problems of any complexity.
Deputy General Director for Industrial Safety A.V. Galyautdinov -
Nizhegorodskie Avtokomponenty LLC expresses gratitude to the team of JSC GC SHANECO for the high-quality and professional performance of consulting work on the preparation of expert opinions related to the issues of production waste generation in the technological process of local treatment facilities at the Non-Ferrous Casting Plant facility.
The work was completed on time and with due quality. SHANECO specialists demonstrated a HIGH level of involvement, effectively interacted with our employees, and carefully took into account all the technical and production features of the facility.
We hope for continued mutually beneficial cooperation and recommend JSC GC SHANECO as a reliable partner and contractor for similar work.
Technical Director A.S. Eryshkanov -
In 2024, JSC "GC SHANECO" completed work on conducting an environmental impact assessment (EIA) and developing a sanitary protection zone (SPZ) project as part of the implementation of the investment project "Pipe Rolling Complex "STALLECT", consisting of:
• Preliminary environmental assessment (PEA), ToR for conducting the EIA.
• Public discussions of the Draft ToR for conducting the EIA.
• Conducting EIA studies.
• Public discussions of EIA materials.
• Technical support during the NGE.
• Development of a unified SPZ project.
• Conducting a public health risk assessment (PHRA).
• Preparation of a map (plan) of the zone with special conditions for the use of the territory (ZOUIT).
• Technical support for the examination of the SPZ project.
• Registration of a sanitary and epidemiological conclusion on the SPZ project.
• Technical support in obtaining the Decision on the establishment of the sanitary protection zone.
• Technical support in entering the sanitary protection zone (SPZ) into the Unified State Register of Real Estate (cadastral registration).
Thanks to the work done, Decision No. 1264/i was received on changing the sanitary protection zone for the industrial site at the address: Republic of Tatarstan, Almetyevsk, Industrialnaya St., 35.
During the project implementation, the specialists of JSC "GC SHANECO" demonstrated a high level of professionalism, promptly resolved emerging issues, competently built communication with all interested parties and confidently defended the company's justified positions at key stages of approval.
OOO "STALLECT" expresses gratitude to the team of JSC "GC SHANECO" for high-quality and well-coordinated work, and also recommends the company as a reliable partner in the implementation of such projects.
We look forward to continuing fruitful cooperation.
General Director of STALLECT LLC A.A. Polivin -
Udokanskaya Med LLC has been cooperating with SHANECO Group of Companies JSC for several years in the implementation of various works in the field of engineering surveys. During the cooperation, a large number of projects have been successfully implemented.
In the period 2024-2025, work was completed on the following facilities:
- "Udokan Mining and Metallurgical Plant. Stage I of construction for a capacity of 12.0 million tons of ore per year. Shift complex";
- "Udokan Mining and Metallurgical Plant. Stage I of construction for a capacity of 12.0 million tons of ore per year. Engineering protection of the territory.
Avalanche protection structure No. 1";
- "Udokan Copper. Stage I of construction for a capacity of 12 million tons of ore per year. Reconstruction of 220 kV overhead line approaches to the 220 kV Chara substation".
- "Udokan Mining and Metallurgical Plant. Stage I of construction with a capacity of 12.0 million tons of ore per year. 220 kV power transmission line Chara - Udokan MMC No. 1, No. 2".
JSC "SHANECO Group" has once again proven itself as a team of professionals, which has demonstrated itself at the highest level, the result of which is receiving positive conclusions on 3 projects, and also prepared reporting materials necessary for the development of RD.
We would like to separately note the projects "Udokan Mining and Metallurgical Plant. Stage I of construction with a capacity of 12.0 million tons of ore per year. Shift complex", "Udokan Mining and Metallurgical Plant. Stage I of construction with a capacity of 12.0 million tons of ore per year. Engineering protection of the territory. Avalanche protection structure No. 1" and "Udokan copper. I stage of construction for the capacity of 12 million tons of ore per year. Reconstruction of the approaches of the 220 kV power line to the 220 kV Chara substation, which received positive conclusions from the Federal Autonomous Institution "Main Directorate of State Expertise" and the non-governmental expertise of PROMMASH TEST EXPERTISE LLC.
It should be noted that the engineering surveys carried out for the preparation of the detailed design documentation for the project "Mining and Metallurgical Plant "Udokan". I stage of construction for the capacity of 12.0 million tons of ore per year. 220 kV power line Chara - Udokan MMC No. 1, No. 2" were also carried out at a high professional level, which also indicates the high quality of the services provided.
Udokanskaya Med LLC can confidently recommend JSC "GC SHANECO" as a reliable and proven partner for the implementation of projects of any complexity.
Director of Design Management A.A. Malinsky -
Dear Ekaterina Vladimirovna!
We hereby express our sincere gratitude to JSC SHANECO Group for their high-quality environmental design services and obtaining a comprehensive environmental permit (CEP) for our company.
As part of our collaboration, the following work was successfully completed:
• Adjusting the inventory report for stationary sources and air pollutant emissions (ISPE);
• Adjusting the draft permissible emission standards (PES) based on the inventory data for stationary sources and air pollutant emissions; o Developing process standards for emissions and discharges of pollutants;
• Technical participation in design documentation reviews (positive expert opinion, sanitary and epidemiological conclusion for the draft NPSPE, CEP).
We appreciate the deep involvement in all processes and the competence of the company's specialists. We thank you for your prompt response to inquiries and professional consultations on obtaining a CEP during the project. The documentation was prepared in accordance with legal requirements and was successfully approved by the authorized bodies.
We express special gratitude to the specialists of JSC "SHANECO Group" - Oksana Aleksandrovna Semenova and Nikolai Nikolaevich Zhizhin - for their high level of professionalism and prompt and effective collaboration in resolving issues that arose during the implementation of these works.
We express interest in continuing our fruitful collaboration and recommend JSC "SHANECO Group" as a reliable partner in the field of environmental support for enterprises.
General Director R. R. Dimukhamedov -
Dear Ekaterina Vladimirovna!
In 2022-2024, JSC "SHANECO Group" completed work on the environmental support of the design documentation for the "Baimsky Mining and Processing Plant.
" Peschanka Copper Deposit Project. Concentration Plant," including:
⦁ engineering and environmental surveys;
⦁ environmental impact assessment (EIA) of the planned
⦁ activity;
⦁ preparation of the "Environmental Protection Measures" section
⦁ of the design documentation;
⦁ development and approval of the sanitary protection zone (SPZ) design;
⦁ technical participation in the State
⦁ environmental review and the State Review of the design
⦁ documentation and engineering survey results. The completed work resulted in positive
conclusions from the State Environmental Expertise (No. 843/04.06.2024.
Order 940/E dated 04.06.2024), the State Expertise (No. 87-1-1-3-
007704-2024 dated 26.02.2024), and a sanitary and epidemiological
conclusion (No. 87.01.03.000.T.000025.06.23 dated 05.06.2023) on the compliance
of the sanitary protection zone project with state sanitary and epidemiological rules and
regulations. JSC "GC SHANECO" has proven itself to be a professional company,
whose employees demonstrated high quality work and prompt problem-solving, both during the design documentation development stage and during its technical support.
OOO "GDK BAIMSKAYA" thanks the company for its work and recommends JSC "GC SHANECO" as a reliable partner for similar projects.
We look forward to further constructive and fruitful cooperation.
Head of the Department for Interaction with Government Agencies
on Environmental Issues, A. N. Filippova -
Dear Ekaterina Vladimirovna!
NPO ALLIANCE WASTE RECYCLING LLC expresses its gratitude to JSC SHANECO Group for its cooperation in conducting the environmental impact assessment (EIA) of the proposed (planned) activity on the draft technical documentation for new equipment and technology:
Process Regulations for "Production of Plasticizer Oils during the Disposal of Waste Oil Products by the Physicochemical Method."
During our collaboration in 2023-2024, JSC SHANECO Group completed the following tasks:
• Adjusting the Process Regulations to the new technology for the disposal of waste oil products;
• Selecting a laboratory for chemical analysis of the generated waste and
analyzing the results;
• Technical support for testing the new technology at a similar facility in Ryazan;
• Environmental impact assessment of the planned activity
and public discussions of the draft technological regulations for "Production of Plasticizer Oils
for the Disposal of Waste Petroleum Products by Physicochemical and Mechanical Methods."
We acknowledge SHANECO's assistance in successfully organizing and conducting public discussions in Moscow, given that this process was complicated by legislative uncertainties at the federal and municipal levels.
We highly appreciate the ability of the company's management and employees to promptly respond to legislative changes and find optimal solutions for the client, which made our collaboration productive.
Overall, SHANECO Group JSC has proven itself to be a reliable partner, open to collaboration. The professionalism of the company's employees allows them to solve even the most complex problems.
We recommend SHANECO Group JSC as a contractor for similar projects.
Managing Director, Individual Entrepreneur I.V. Kornin -
Dear Ekaterina Vladimirovna!
In 2022-2024, JSC SHANECO Group developed a project for the reclamation of disturbed lands, including environmental impact assessment (EIA) studies for waste disposal sites at the Ledyanoy Stream and Levtyrinyvayam River mining sites. This project included:
- preliminary environmental assessment;
- development of the economic justification for reclamation;
- methodological support and analysis of engineering survey reports;
- development of the technical part of the reclamation project;
- environmental impact assessment studies;
- public consultations on the reclamation project;
- development of "Environmental Protection Measures" for the reclamation project;
- technical participation in the State Environmental Expertise.
As a result of this work, a positive conclusion was received from the State Environmental Expertise No. 030-1-1568P-24. Order No. 55-e dated December 18, 2024.
During the project's implementation, the employees of JSC "SHANECO Group" demonstrated high-quality work and prompt resolution of uncertainties, both during the documentation development stage
and during the State Environmental Review.
JSC "KGD" thanks SHANECO for its work and recommends JSC "SHANECO Group" as a reliable partner for similar projects.
We look forward to continued constructive cooperation.
Acting General Director Ya.V. Nesterenko -
Specialized Developer Dogma-Omsk LLC expresses its gratitude to SHANECO Group JSC for the high-quality and timely performance of work within the framework of the development and approval of the sanitary break project for the designed open ground parking garage, including:
development of the sanitary break (SR) zone project;
technical support during the sanitary and epidemiological examination of the SR project;
review of the SR project in Rospotrebnadzor.
The sanitary break project was developed in full compliance with current legislation and successfully received all the necessary approvals.
We especially note the strict adherence to deadlines, the professionalism of SHANECO Group JSC specialists and the ability to work in a team with the Customer.
Specialized Developer Dogma-Omsk LLC recommends SHANECO Group JSC as a reliable partner when performing similar work.
We hope for fruitful cooperation in the future!
General manager
LLC Specialized
developer "Dogma-Omsk" D.N. Semenikhin -
In 2024, SHANECO Group JSC organized and held public discussions on the subject of state environmental review - the design documentation of the Novolenskaya TPP, including preliminary environmental impact assessment (EIA) materials.
The organization of public discussions was carried out clearly, on time and met all legal requirements. The SHANECO Group JSC team demonstrated professionalism, ensuring a clear structure of events and accessibility of information for discussion participants and authorized bodies. Thanks to attention to detail and clear planning, public discussions were held as efficiently as possible, which ensured the fulfillment of design deadlines and entry into expert reviews.
Our company has been successfully cooperating with SHANECO Group JSC for many years and once again the specialists have confirmed their professionalism and competence. During our joint work, the company has established itself as a reliable partner that strictly complies with contractual obligations and demonstrates a responsible approach to their implementation.
I would especially like to note the timely response of the SHANECO team to customer requests, and the ability to find optimal solutions in difficult situations.
We recommend JSC "SHANECO Group" as a reliable business partner for cooperation.
Director of Generation Project Management I.Yu. Likunov -
EVRAZ once again expresses its deep gratitude to the specialists of JSC "GC SHANECO" for the high quality of work (development of environmental sections of design documentation for the construction of a new plant, holding public discussions, supporting design documentation during examinations) in an extremely short time frame. We highly appreciate the professionalism, reliability and customer focus of the JSC "GC SHANECO" team, with whom our joint work was, as always, very comfortable and productive. Special thanks for your willingness to share knowledge and provide consulting support on almost all environmental protection issues that arise for the user of natural resources.
Director of the Directorate for Coordination of Environmental Activities of EVRAZ M.A. Epifantsev -
Our cooperation with the company Joint-Stock Company
"Group of Companies SHANECO" (JSC "GC SHANECO") has been going on since 2017 to the present. During this time, a large number of projects have been successfully implemented. Throughout the entire period of cooperation, the company has established itself as a reliable business partner that demonstrates a high level of knowledge and experience in its field, which allows us to provide high-quality services for engineering surveys. Attentive attention to detail and willingness to discuss any issues makes cooperation very comfortable.
Udokanskaya Med LLC expresses gratitude to JSC "GC SHANECO" for the high-quality performance of engineering surveys for the next project "Mining and Metallurgical Plant "Udokan". Storage site for sulfuric acid tank containers", during which JSC "GC SHANECO" proved itself as a professional company, demonstrating a high level of quality work, efficiency in solving problems, the ability to work in a team and focus on results. Udokanskaya Med LLC can confidently recommend SHANECO Group of Companies JSC as a reliable and proven partner for the implementation of projects of any complexity!
We hope for further constructive and fruitful cooperation.
Director of Design Management
(based on power of attorney No. 158 dated 02.11.2024) A.A. Malinsky -
In 2024, JSC GC SHANECO organized and carried out a set of works to obtain Urban Development Plans for land plots in the amount of 36 (thirty-six) land plots for the following objects: "Udokan Mining and Metallurgical Plant. Stage I of construction with a capacity of 12 million tons of ore per year."
Thanks to the professionalism and high qualifications of JSC GC SHANECO specialists, the ability to work in close cooperation with the customer, all work was completed with high quality within the specified time frame.
We note JSC GC SHANECO as a reliable partner open to cooperation. The level of professional training of the company's employees allows them to solve complex problems.
We recommend JSC GC SHANECO as a contractor for similar works, we note the high competitiveness of the company.
Also, the management of Udokanskaya Med LLC has agreed to post the review and news on the official website of JSC SHANECO Group
Director of Design Management A.A. Malinsky -
In 2023-2024, JSC "GC SHANECO" provided environmental support for the development and examination of design documentation for a capital construction project: "JSC Stoilensky GOK" Drainage Mine. Construction of a natural quality wastewater drainage system into a surface water body" consisting of:
• preliminary environmental assessment;
• environmental impact assessment (EIA);
• public discussions on the planned activity;
• preparation of section 8 of the design documentation "Environmental Protection Measures";
• technical participation in the State examination of design documentation and survey results.
The well-coordinated work of JSC "GC SHANECO" specialists made it possible to receive a positive conclusion from the State examination within the established time frame without additional financial and time costs.
The employees of JSC "GC SHANECO" demonstrated a high level of quality work, efficiency in solving problems and focus on results.
NTC NOVOTEK LLC thanks the company for the work done and recommends JSC SHANECO Group as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
Director of NTC NOVOTEK LLC O.I. Pisarev -
OOO "Pravourmiyskoye" has been cooperating with JSC "GC SHANECO" for several years in the context of various works in the field of engineering surveys.
In the period from 2022 to 2023, JSC "GC SHANECO" completed work on engineering and environmental surveys and documentation support for the facility "Mining and processing enterprise based on the tin ore deposit "Pravourmiyskoye". Underground mine with infrastructure."
During the engineering and environmental surveys, the necessary data were obtained to assess the impact of the planned, an assessment of the current state of the environment was made, and samples of all components of the natural environment were taken. Engineering surveys were carried out in a volume sufficient for the development of design and working documentation, and passing the state examination.
We note the high degree of personal responsibility of each specialist of your organization involved in this work, compliance with contractual deadlines, the shortest possible time for processing expert comments, effective interaction with the designer and the customer, the quality and information content of weekly reports and final documentation.
Based on the results of the review by the Federal Autonomous Institution "Glavgosexpertiza of Russia" of the technical report on engineering and environmental surveys as part of the design documentation set, a positive expert opinion was received.
During the work, JSC "GC SHANECO>> has proven itself as a professional Company. OOO "Pravourmiyskoye" thanks your company for the work done and recommends JSC "GC SHANECO" as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
General Director S. V. Antonov
-
In 2024, the Joint-Stock Company SHANECO Group of Companies (hereinafter referred to as JSC SHANECO Group of Companies) completed work on calculating greenhouse gas emissions from sources of objects with a negative impact on the environment of the Norilsk Obespechivayushchiy Kompleks Limited Liability Company (hereinafter referred to as the Customer, the Company).
The employees of JSC SHANECO Group of Companies demonstrated a high level of professionalism, close interaction with the Customer in the process of preparing the necessary initial data, and provided consulting support.
All work was completed on time, with high quality, the Company recommends JSC SHANECO Group of Companies as a contractor for similar work.
Acting Head of the Ecology Department Ya.V. Safonovа -
JSC "GC SHANECO" in 2023-2024 developed:
- inventory of sources of pollutant emissions into the atmosphere and a draft of Standards for permissible emissions of pollutants into the atmosphere for the object of the unauthorized environmental impact assessment of the Podgolechnoye mining and processing plant:
- a draft of Standards for permissible emissions of pollutants into the atmosphere for the object of the unauthorized environmental impact assessment of the Nizhneyakokitsky mining and processing plant.
The documentation was completed at a high level of quality. Both projects received positive expert and sanitary-epidemiological conclusions, as well as permits for emissions of pollutants into the atmosphere from the Office of Rosprirodnadzor in the Republic of Sakha (Yakutia).
We would like to especially note the flexibility and efficiency of the management and employees of SHANECO in resolving issues arising during the work, the ability to quickly respond to changes in legislation and find optimal solutions for the customer, thanks to which the cooperation was as productive and comfortable as possible.
We note JSC "GC SHANECO" as a reliable partner, open to cooperation, the level of professional training of the company's employees allows solving complex problems.
We recommend JSC "GC SHANECO" as a contractor for similar work, we note the high competitiveness of the company.
First Deputy General Director for Production N.V. Goncharov