References
-
Our cooperation with the company Joint-Stock Company
"Group of Companies SHANECO" (JSC "GC SHANECO") has been going on since 2017 to the present. During this time, a large number of projects have been successfully implemented. Throughout the entire period of cooperation, the company has established itself as a reliable business partner that demonstrates a high level of knowledge and experience in its field, which allows us to provide high-quality services for engineering surveys. Attentive attention to detail and willingness to discuss any issues makes cooperation very comfortable.
Udokanskaya Med LLC expresses gratitude to JSC "GC SHANECO" for the high-quality performance of engineering surveys for the next project "Mining and Metallurgical Plant "Udokan". Storage site for sulfuric acid tank containers", during which JSC "GC SHANECO" proved itself as a professional company, demonstrating a high level of quality work, efficiency in solving problems, the ability to work in a team and focus on results. Udokanskaya Med LLC can confidently recommend SHANECO Group of Companies JSC as a reliable and proven partner for the implementation of projects of any complexity!
We hope for further constructive and fruitful cooperation.
Director of Design Management
(based on power of attorney No. 158 dated 02.11.2024) A.A. Malinsky -
In 2024, JSC GC SHANECO organized and carried out a set of works to obtain Urban Development Plans for land plots in the amount of 36 (thirty-six) land plots for the following objects: "Udokan Mining and Metallurgical Plant. Stage I of construction with a capacity of 12 million tons of ore per year."
Thanks to the professionalism and high qualifications of JSC GC SHANECO specialists, the ability to work in close cooperation with the customer, all work was completed with high quality within the specified time frame.
We note JSC GC SHANECO as a reliable partner open to cooperation. The level of professional training of the company's employees allows them to solve complex problems.
We recommend JSC GC SHANECO as a contractor for similar works, we note the high competitiveness of the company.
Also, the management of Udokanskaya Med LLC has agreed to post the review and news on the official website of JSC SHANECO Group
Director of Design Management A.A. Malinsky -
In 2023-2024, JSC "GC SHANECO" provided environmental support for the development and examination of design documentation for a capital construction project: "JSC Stoilensky GOK" Drainage Mine. Construction of a natural quality wastewater drainage system into a surface water body" consisting of:
• preliminary environmental assessment;
• environmental impact assessment (EIA);
• public discussions on the planned activity;
• preparation of section 8 of the design documentation "Environmental Protection Measures";
• technical participation in the State examination of design documentation and survey results.
The well-coordinated work of JSC "GC SHANECO" specialists made it possible to receive a positive conclusion from the State examination within the established time frame without additional financial and time costs.
The employees of JSC "GC SHANECO" demonstrated a high level of quality work, efficiency in solving problems and focus on results.
NTC NOVOTEK LLC thanks the company for the work done and recommends JSC SHANECO Group as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
Director of NTC NOVOTEK LLC O.I. Pisarev -
OOO "Pravourmiyskoye" has been cooperating with JSC "GC SHANECO" for several years in the context of various works in the field of engineering surveys.
In the period from 2022 to 2023, JSC "GC SHANECO" completed work on engineering and environmental surveys and documentation support for the facility "Mining and processing enterprise based on the tin ore deposit "Pravourmiyskoye". Underground mine with infrastructure."
During the engineering and environmental surveys, the necessary data were obtained to assess the impact of the planned, an assessment of the current state of the environment was made, and samples of all components of the natural environment were taken. Engineering surveys were carried out in a volume sufficient for the development of design and working documentation, and passing the state examination.
We note the high degree of personal responsibility of each specialist of your organization involved in this work, compliance with contractual deadlines, the shortest possible time for processing expert comments, effective interaction with the designer and the customer, the quality and information content of weekly reports and final documentation.
Based on the results of the review by the Federal Autonomous Institution "Glavgosexpertiza of Russia" of the technical report on engineering and environmental surveys as part of the design documentation set, a positive expert opinion was received.
During the work, JSC "GC SHANECO>> has proven itself as a professional Company. OOO "Pravourmiyskoye" thanks your company for the work done and recommends JSC "GC SHANECO" as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
General Director S. V. Antonov
-
In 2024, the Joint-Stock Company SHANECO Group of Companies (hereinafter referred to as JSC SHANECO Group of Companies) completed work on calculating greenhouse gas emissions from sources of objects with a negative impact on the environment of the Norilsk Obespechivayushchiy Kompleks Limited Liability Company (hereinafter referred to as the Customer, the Company).
The employees of JSC SHANECO Group of Companies demonstrated a high level of professionalism, close interaction with the Customer in the process of preparing the necessary initial data, and provided consulting support.
All work was completed on time, with high quality, the Company recommends JSC SHANECO Group of Companies as a contractor for similar work.
Acting Head of the Ecology Department Ya.V. Safonovа -
JSC "GC SHANECO" in 2023-2024 developed:
- inventory of sources of pollutant emissions into the atmosphere and a draft of Standards for permissible emissions of pollutants into the atmosphere for the object of the unauthorized environmental impact assessment of the Podgolechnoye mining and processing plant:
- a draft of Standards for permissible emissions of pollutants into the atmosphere for the object of the unauthorized environmental impact assessment of the Nizhneyakokitsky mining and processing plant.
The documentation was completed at a high level of quality. Both projects received positive expert and sanitary-epidemiological conclusions, as well as permits for emissions of pollutants into the atmosphere from the Office of Rosprirodnadzor in the Republic of Sakha (Yakutia).
We would like to especially note the flexibility and efficiency of the management and employees of SHANECO in resolving issues arising during the work, the ability to quickly respond to changes in legislation and find optimal solutions for the customer, thanks to which the cooperation was as productive and comfortable as possible.
We note JSC "GC SHANECO" as a reliable partner, open to cooperation, the level of professional training of the company's employees allows solving complex problems.
We recommend JSC "GC SHANECO" as a contractor for similar work, we note the high competitiveness of the company.
First Deputy General Director for Production N.V. Goncharov -
JSC "GC SHANECO" provided qualified consulting support during the commissioning of the Gold Recovery Plant at the Murzinskoye site. SHANECO's work included adjusting the "Environmental Protection Measures" section of the design documentation, including taking into account the clarifications received from the territorial office of Rosprirodnadzor, as a result of which the federal state environmental supervision body issued an environmental certificate of compliance (ECOZOS) for the capital construction project.
In addition, JSC "GC SHANECO" successfully completed work to obtain a Comprehensive Environmental Permit (CEP) for the Gold Recovery Plant at the Murzinskoye site (approved by the Order of the South Siberian Interregional Office of the Federal Service for Supervision of Natural Resource Management dated 01.07.2024 No. 1090-rd),
The work was completed with high quality within the scheduled time frame. We note the high readiness of the specialists of the SHANECO Group of Companies for constructive work with the customer and regulatory authorities, their focus on obtaining a positive result.
We recommend JSC "SHANECO Group of Companies" as a reliable partner and contractor for similar work.
Executive Director of OOO "Artel Prospectors Poisk" V.V. Olyunin -
JSC "GC SHANECO" in 2024, organized and held public discussions of the design documentation of the state environmental impact assessment facility "Underground mine at the Nerundinskoye gold deposit in the Severobaikalsk region of the Republic of Buryatia", including preliminary environmental impact assessment (EIA) materials.
Thanks to the professionalism and high qualifications of the specialists of JSC "GC SHANECO", the ability to work in close cooperation with the customer, all work was completed with high quality within the scheduled time frame.
We note JSC "GC SHANECO" as a reliable partner, open to interaction, the level of professional training of the company's employees allows solving complex problems.
We recommend JSC "GC SHANECO" as a contractor for similar work, we note the high competitiveness of the company.
Executive Director N.A. Garbuzov -
Our company would like to express its gratitude to the team of JSC "GC SHANECO" for the work on surveying noise sources for the production site of OOO "Agrotekhnologii" (393670, Tambov Region, Zherdevka, Neplanovaya St., 17A) including:
Inventory of noise sources, photo recording of noise sources with reference to the terrain.
Carrying out noise measurements on the territory of the production site and the adjacent residential area during operation in normal and maximum modes.
Drawing up a map of noise sources with determination of their actual sound power during operation in normal and maximum modes.
Determination of the degree of attenuation of the sound wave of the most powerful noise sources.
Drawing up a map of the propagation of sound waves in the adjacent residential area.
Preparation of a report including noise maps, noise measurement protocols and recommendations for reducing noise during equipment operation.
The work under the contract was completed promptly and within the time frame specified in the contract. During the work, the employees of JSC "GC SHANECO" were always in touch and answered all questions that arose.
As a result of the implementation of noise protection measures, the required result in reducing the noise level from the enterprise's sources was achieved.
OOO "Agrotekhnologii" recommends JSC "GC SHANECO" as a contractor for similar work.
Head of the department for processing and storing finished products
OOO "Agrotekhnologii" A.A. Zolotov -
In the period from 2020 to 2022, the company "SHANECO Siberia" performed Engineering and Environmental Surveys under a contract with the company Non-Commercial Partnership "Center for Environmental Assessment "Ecoline" for the facility "Baimsky GOK. Copper Deposit Project "Peschanka". Tailings Facility. (Chukotka Autonomous Okrug)".
We consider it necessary to note the high professionalism of the company's employees and the optimal technical equipment of the field and office groups, which made it possible to solve all the tasks set by the technical specifications in a short time and in difficult climatic conditions.
It should be especially noted that the company's employees made all adjustments and made all additions to the reporting documentation in a short time according to the wishes of the Customer and the General Customer of the work without references to the absence of requirements for the volume and form of presentation of materials in the technical specifications. These actions indicate a high customer focus of the company, the desire to obtain the final result, a positive expert opinion and provide the designers with the desired information for the design.
Director of the Non-Commercial Partnership
"Center for Environmental Assessment "Ecoline" Khotuleva M.V. -
In 2023-2024, JSC "GC SHANECO" provided environmental support for the development and examination of design documentation for a capital construction project: "JSC Stoilensky GOK" Drainage Mine. Construction of a natural quality wastewater drainage system into a surface water body" consisting of:
• preliminary environmental assessment;
• environmental impact assessment (EIA);
• public discussions on the planned activity;
• preparation of section 8 of the design documentation "Environmental Protection Measures";
• technical participation in the State examination of design documentation and survey results.
The well-coordinated work of JSC "GC SHANECO" specialists made it possible to receive a positive conclusion from the State examination within the established time frame without additional financial and time costs.
The employees of JSC "GC SHANECO" demonstrated a high level of quality work, efficiency in solving problems and focus on results.
NTC NOVOTEK LLC thanks the company for the work done and recommends JSC SHANECO Group as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
Director of NTC NOVOTEK LLC O.I. Pisarev -
JSC "GC SHANECO" in 2023-2024 developed industrial environmental control (IEC) programs for five objects of negative impact on the environment of the holding "Zoloto Seligdara":
• Mining and Processing Complex "Nizhneyakokitsky";
• Mining and Processing Complex "Podgolechnoye";
• Mining and Processing Complex "Samolazovsky";
• Mining and Processing Complex "Ryabinovy";
• Mining and Processing Complex "Lunnoye".
We note JSC "GC SHANECO" as a reliable partner, open to cooperation, the level of professional training of the company's employees allows solving complex problems.
We recommend JSC "GC SHANECO" as a contractor for similar works, we note the high competitiveness of the company.
General Director Tatarinov S.M. -
Ryabinovoye LLC expresses gratitude to the team of JSC SHANECO Group for the work performed in 2022-2024 at the Ryabinovoye Mining and Processing Plant, in particular:
• adjustment of the report on the inventory of stationary sources and emissions of pollutants into the atmosphere;
• development of a draft of standards for permissible emissions (SPE);
• obtaining a Sanitary and Epidemiological Conclusion on the SPE draft in the Office of the Federal Service for Supervision of Consumer Rights Protection and Human Wellbeing in the Republic of Sakha (Yakutia) and a Permit for Emissions of Pollutants into the Atmospheric Air in the Office of Rosprirodnadzor in the Republic of Sakha (Yakutia);
• development and approval of an action plan to reduce emissions of pollutants into the atmosphere during periods of adverse medical conditions in the Ministry of Ecology, Nature Management and Forestry of the Republic of Sakha (Yakutia).
The employees of JSC "GC SHANECO" demonstrated a high level of professionalism, close interaction with the Customer, and ensured prompt resolution of complex problems.
All work was completed in a timely manner, with high quality, OOO "Ryabinovoe" recommends JSC "GC SHANECO" as a contractor for similar works.
Director Tatarinov S. M.
OOO "Ryabinovoe" expresses gratitude to the team of JSC "GC SHANECO" for the preparation and approval of the sanitary protection zone project, conducting a risk assessment for public health and drawing up the Decision on the establishment of a sanitary protection zone with the entry of information about the sanitary protection zone in the Unified State Register of Real Estate for the Ryabinovoe Mining and Processing Plant.
The employees of JSC "GC SHANECO" demonstrated a high level of professionalism, close interaction with the Customer, and ensured prompt resolution of complex problems.
All work was completed in a timely manner, with high quality, OOO "Ryabinovoe" recommends JSC "GC A KO" as a contractor for similar works.
Director Tatarinov S. M. -
Our cooperation with the company Joint-Stock Company "Group of Companies SHANECO" (JSC "GC SHANECO"), continues from 2014 to the present. During this time, several large projects have been successfully completed. Throughout the entire period of cooperation, the company has established itself as a reliable business partner that demonstrates a high level of knowledge and experience in its field, which allows us to provide high-quality services for surveys. Attentive attention to detail and willingness to discuss any issues makes cooperation very comfortable. The surveys were completed on time and with the highest accuracy, which allowed us to successfully implement our projects.
Thanks to the main principle of the company's work - the formation of partnerships with clients based on professionalism and mutual cooperation, Joint-Stock Company "SHANECO Group of Companies" (JSC "SHANECO Group of Companies"), in our opinion, occupies a stable position in the field of surveys, and we can confidently recommend it as a reliable and proven partner for the implementation of projects requiring surveys!
We hope for further effective cooperation.
Sincerely,
General Director A. V. Sokolovsky -
JSC "SHANECO" provided JSC "Bystrinskaya Mining Company" with services for the development of working documentation for the sections of the KR KZh, EOM for the facility "BRU at the Kumroch field in the Ust-Kamchatsky district of the Kamchatka Territory".
As part of the services provided, the specialists of JSC "SHANECO" demonstrated a high professional level.
The work was completed efficiently and within the agreed time frame.
JSC "Bystrinskaya Mining Company" expresses gratitude to JSC "SHANECO" and hopes for further fruitful cooperation.
Sincerely,
Director of Design of JSC Bystrinskaya Mining Company Patlach Aleksandr Ivanovich
JSC SHANECO provided JSC Bystrinskaya Mining Company with services for adjusting space-planning and design solutions, materials of the PM OOS for the facility: "Construction of an input fuel and lubricants warehouse on the coast of the Kamchatka Gulf in the Ust-Kamchatsky District of the Kamchatka Territory" in connection with and in accordance with the implemented complex of scientific and technical support (STS) for the design and construction of a facility in a complex seismically hazardous area, in cooperation with scientific organizations involved by the Customer. As part of the services provided, the specialists of JSC SHANECO demonstrated a high professional level.
The work was completed efficiently and within the agreed time frame.
JSC Bystrinskaya Mining Company expresses gratitude to JSC SHANECO and hopes for further fruitful cooperation.
Sincerely,
Director of Design of JSC "Bystrinskaya Mining Company" Patlach Alexander Ivanovich -
In accordance with the terms of the Agreement for the provision of consulting services No. 0948 dated September 21, 2021, JSC "GC SHANECO" performed an environmental and social impact assessment (ESIA) of the casting and rolling complex (CRC) project of JSC "Uzmetkombinat" (Republic of Uzbekistan, Bekabad) in accordance with the standards of the International Finance Corporation, and also provided related services on environmental and social issues for the CRC project.
Under the agreement, SHANECO performed the following works:
● preliminary environmental and social assessment of the CRC project, preparation, assignments for conducting an environmental and social assessment;
● baseline studies;
● development and approval of the sanitary protection zone project of JSC "Uzmetkombinat";
● environmental and social assessment of the CRC project;
● preparation of the Environmental and Social Policy of JSC "Uzmetkombinat";
● a set of works on informing and interacting with stakeholders;
● development of Action Plans in the field of environmental protection, social responsibility, safety and health.
The specified works were performed in full compliance with the terms of the Technical Assignment within the specified time frame.
JSC Uzmetkombinat recommends JSC GC SHANECO as a reliable contractor with all the capabilities to perform similar works.
Deputy Chairman of the Board - Financial Director Budey T.A. -
AO "Shaneko" provided AO "Tin Ore Company" with services for the development of the CALCULATION OF PROBABLE DAMAGE THAT MAY BE CAUSED AS A RESULT OF THE ACCIDENT OF THE HYDRAULIC STRUCTURE "THE LANDFILL "DRY" LUBRICATION OF KEKA FILTRATION OF XBOCTOB SOLAR CONCENTRATION PLANT (SOF)".
As part of the services provided, AO "Shaneko" specialists demonstrated a high professional level.
The work was completed efficiently and within the agreed time frame.
AO "Tin Ore Company" expresses gratitude to AO "Shaneko" and hopes for further fruitful cooperation.
General Director, Head of the organization K.A. Kovalenko
AO "Shaneko" provided AO "Tin Ore Company" with services for the development of working documentation for the work of the 2nd stage of construction of the "DRY" STORAGE POLYGON OF KEKA FILTRATION OF XBOCTOB SOLAR PROCESSING PLANT (SOF)".
As part of the services provided, the specialists of AO "Shaneko" demonstrated a high professional level.
The work was completed qualitatively and within the agreed time frame.
AO "Tin Ore Company" expresses gratitude to AO "Shaneko" and hopes for further fruitful cooperation.
Director Kovalenko K. A. -
n 2023, JSC "GC SHANECO" completed work on organizing and conducting public discussions on the object of state environmental expertise - design documentation "PS 110 kV GNPS Payakha" with the 110 kV overhead power line "GTES Irkinskaya PS 110 kV GNPS Payakha" for the needs of Vostok Oil LLC, including preliminary OBOC materials.
Thanks to the professionalism and high qualifications of the specialists of JSC "GC SHANECO", the ability to conduct prompt and competent work in close cooperation with the customer, the successful completion of the public discussion procedure and subsequently obtaining a positive conclusion of the State Environmental Expertise were ensured.
We note JSC "GC SHANECO" as a reliable partner, open to interaction, the level of professional training of the company's employees, which allows solving problems of varying complexity.
We recommend JSC "GC SHANECO" as a contractor for similar work, we note the high competitiveness of the company.
Sincerely, Project Manager I.Yu. Likunov -
Inter PAO Engineering LLC has been cooperating with the SHANECO Group of Companies for over ten years. Over these years, AO GC SHANECO has proven itself to be a reliable professional partner, providing highly qualified support to Inter PAO Engineering LLC on a project in the Kaliningrad Region in terms of eco-analytical studies and measurements, public hearings and environmental support for large projects. All work was completed with due quality and within the established deadlines.
In 2023, professional support by AO GC SHANECO of design and survey work during the State Environmental Expertise gave the green light to the project for the construction of an energy facility in the harsh climatic conditions of the north of the Krasnoyarsk Territory.
Inter PAO Engineering LLC hereby thanks the AO GC SHANECO team for their long-term, professional work and recommends the company as a reliable partner in the field of design and survey work.
Deputy General Director I.I. Opalin -
SPb-Giproshakht LLC expresses gratitude to the team of SHANECO Siberia (branch of JSC SHANECO Group) for the high quality of engineering and environmental surveys performed in compliance with the deadlines for the work, for the high professionalism of the employees and their communication skills during the work on the project "Project for the development of the placer gold deposit of the Egdegkych stream, right tributary of the Baimka river (river l. 61-79.5)".
We recommend SHANECO Siberia - a branch of JSC SHANECO Group as a reliable partner.
We look forward to further cooperation.
General Director A.S. Stolov -
The Industrial Safety Directorate of AO MXK EuroChem thanks AO GC SHANECO for its active participation in the 1st Environmental Conference of the United EuroChem, which was held on November 14, 2023 in Moscow, for preparing professional reports and speaking on two topical issues:
1) The practice of obtaining a comprehensive environmental permit. Analysis of the causes of refusals and problems in the process of obtaining a comprehensive environmental permit;
2) Environmental expertise of design documentation for Category I facilities. Problem areas when passing the SEE.
A distinctive feature of the presented reports is not only their methodological compliance with modern legislative requirements of the Russian Federation, but also their practical significance for application at EuroChem Group enterprises.
The reports aroused keen interest and response from EuroChem Group specialists, and the experience that AO GC SHANECO shared with the professional community will be useful for business in its daily work.
Deputy General Director -
Director for Industrial
Safety O.V. Nikolaenko -
InEkA-consulting LLC expresses gratitude to SHANECO Group of Companies JSC for the high-quality and timely execution of engineering and environmental surveys for two projects: Bratsk Aluminum Plant, Environmental Reconstruction and Krasnoyarsk Aluminum Plant. Environmental Reconstruction, as well as successful support within the framework of the state environmental assessment and the Federal Autonomous Institution Main State Expertise of Russia in 2023.
Based on the results of interaction with your company, I would like to note the high qualifications of SHANECO Group of Companies JSC specialists participating in the projects, who demonstrated high professionalism during the work, which became the basis for the successful and logical completion of the projects.
InEkA-consulting LLC thanks you for your cooperation and recommends SHANECO Group of Companies JSC as a reliable partner when performing similar work.
We hope for further constructive and fruitful cooperation.
Director Perfilyev E.E. -
In 2022-2023, JSC "GC SHA,NEKO" completed work to adjust the Design documentation taking into account the actually implemented solutions and support during the state environmental assessment for the facility: "Site for processing, disposal and neutralization of oil-containing waste" at JSC Gazpromneft-ONPZ. The main objective in adjusting the Design documentation was to bring the design documentation into line with the actually constructed facility, as well as to remove the order of Rosprirodnadzor and obtain an Environmental Conclusion on the compliance of the constructed facility with the design documentation. An Environmental Conclusion was received for the existing provision on the facility "Site for processing, disposal and neutralization of oil-containing waste" at JSC Gazpromneft-ONPZ, however, the order has not yet been lifted, due to the moratorium on inspections by Rosprirodnadzor. It should be noted that during the receipt of the Environmental Conclusion by Rosprirodnadzor, inconsistencies were identified in the design documentation regarding the locations of waste accumulation sites, the list of substances generated during bioremediation, and other technical typos in the documentation, which in turn was not critical for issuing the Environmental Conclusion.
For our part, we consider it necessary to note the significant volume (heaviness) of the files (especially the graphic part), which hinders prompt work with the documentation and the presence of information not related to the design object.
We consider it acceptable to post general information about the work performed on the object: "Site for processing, recycling and neutralization of oil-containing waste" on JSC Gazpromneft-ONPZ, the official website of JSC SHANECO Group of Companies in the version presented in the Appendix.
We note JSC SHANECO Group of Companies as a reliable partner, open to interaction, the level of professional training of the company's employees allows solving the tasks set.
Sincerely,
Deputy General Director for Fire Safety, Labor Protection, Civil Protection and Environmental Protection V.N. Generalov -
We would like to express our gratitude to JSC "GC SHANECO" for the work carried out to prepare and coordinate the sanitary protection zone project of the Branch of OOO Gazpromneft-SM "OZSM" (taking into account new data on the GIDP installation complex).
Thanks to the active participation of your company, the sanitary protection zone of the Branch of OOO Gazpromneft-SM "OZSM" was established and entered into the Unified State Register of Real Estate.
We would like to express special gratitude to the employees of SHANECO for their professionalism and flexible approach in carrying out these works, taking into account the opinion of the Customer at all stages of the work.
We note that this work has significantly reduced environmental risks in the design and construction of the hydroisodewaxing unit (GIDP) complex.
Head of the project office for the construction of the GIDP installation complex M.V. Skakun -
The management and specialists of Migrup Proekt LLC express their gratitude to GC Shaneko JSC for the high-quality and timely execution of work on adjusting the engineering and environmental surveys for the project of Lebedinsky GOK JSC. Processing plant. Tailings facility. Sludge and rock systems section. Thickener No. 1" in 2022 and successful support within the framework of the state environmental assessment and the Federal Autonomous Institution "Glavgosexpertiza of Russia" in 2023.
We hope for further constructive and fruitful cooperation.
General Director Babich N.A. -
JSC "SHANECO Group" provided JSC "Bystrinskaya Mining Company" with services for the development of design documentation for the facility: Construction of a mining and processing plant at the Kumroch deposit in the Ust-Kamchatsky municipal district of the Kamchatka Territory. 1st stage. Infrastructure facilities. Section 5. Information on engineering equipment, on engineering and technical support networks, a list of engineering and technical measures, the content of technological solutions. Subsection 2. Water supply system. Calculation of the standard water consumption and the volume of water for external fire extinguishing
As part of the services provided, the specialists of JSC "SHANECO Group" demonstrated a high professional level.
The work was completed efficiently and within the agreed time frame.
JSC "Bystrinskaya Mining Company" expresses gratitude to JSC "SHANECO Group" and hopes for further fruitful cooperation.
Chief Project Engineer I.V. Alekseev -
JSC Zoloto Seligdara expresses gratitude to the team of JSC GC SHANECO for the work on the preparation, approval of the sanitary protection zone project, conducting a risk assessment for public health and obtaining the Decision on the establishment of the sanitary protection zone for the production site of the Nizhneyakokitsky Mining and Processing Complex.
The employees of JSC GC SHANECO demonstrated a high level of professionalism, close interaction with the Customer, prompt response to urgent tasks, including at the stage of project approval.
JSC Zoloto Seligdara recommends JSC GC SHANECO as a contractor for similar work.
Head of the Ecology Department S.V. Dmitrieva -
ITPI LLC, based on the results of cooperation within the framework of the project "Performing engineering surveys and developing a project for recultivation of the contaminated territory of FSUE "PO "KHK "YENISEI"" and Contract No. 1026 dated October 28, 2022, sends feedback on the work performed:
The Analytical Center of JSC "SHANECO Group" for the first time provided services for laboratory testing of soil and soil samples for LLC "ITPI".
The work was carried out in an extremely short time, the employees of the AC of JSC "SHANECO Group" proved themselves as competent and responsible specialists, fulfilling their obligations on time and at the appropriate level of quality.
The samples were tested at a high technical level using modern equipment and technologies in accordance with the methods.
Issues arising in the course of work were resolved promptly, comments were immediately eliminated.
LLC "ITPI" thanks the Analytical Center of JSC "SHANECO Group" for cooperation and recommends to perform similar work.
General Director M.V. Gagarin -
In accordance with the terms of the Agreement No. AGRP-9-22 dated 09/19/2022, SHANECO Group JSC dated technogenic formations on the license area of BLG 03380 BE (Amur Region, Tynda district).
As part of the work under the contract, a set of studies was carried out.
LLC Amur Geological Exploration Enterprise recommends SHANECO Group JSC as a reliable contractor with all the capabilities to perform similar work.
General Director M.G. Shmonov -
SHANECO Group JSC is a long-standing partner of our company, has repeatedly performed work on environmental support for the reconstruction of the existing plant and the construction of new production facilities.
The prompt inclusion of your company in these projects made it possible to minimize the risks of expert opinions, to ensure the implementation of the design schedule.
JSC "Vyksa Metallurgical Plant" thanks your team for the high-quality and timely performance of these services and recommends SHANECO Group JSC as a performer of similar works.
Director of Production Safety V.I. Ageev
-
EVRAZ has been cooperating with SHANECO Group JSC for several years in the framework of various works in the field of environmental protection: the development of an EIA, public discussions, support of the state environmental expertise, the development of the SPZ project and its approval, the audit of the water supply and sanitation system of the enterprise, etc.
We would like to express our gratitude to the entire SHANEСO team for their efficiency, clarity, quality, professionalism, absolute reliability and willingness to help almost 24/7. Despite the fact that our projects were far from the only ones you have, we have never heard that you are tired, overloaded and you are not up to us right now. Thank you for such a high customer focus! This is the incredible work of each team member and the business culture formed in the company!
Director of the Directorate for the Coordination of Environmental Activities EVRAZ M.A. Epifantsev -
JSC "SHANECO Group" carried out work on the development and approval of the draft waste generation standards and limits on their placement (PNOOLR) for JSC "Gazpromneft - MNPZ". Based on the results of the work, a document was received on the approval of waste generation standards and limits on their placement in regulatory state bodies.
During the work, JSC "SHANECO Group" has proved itself as a professional company, employees have shown a high level of quality of work; efficiency in solving tasks, both at the stage of development of project documentation, and when "its technical support in specially authorized bodies.
JSC Gazpromneft - MNPZ thanks your company for the work done and recommends JSC "SHANECO Group" as a reliable partner in performing similar work.
Deputy General Director for Industrial Safety A.V. Galyautdinov -
JSC "SHANECO Group" carried out work on the development and coordination of the project of the sanitary protection zone of the Industrial hub of the Branch of LLC "HeidelbergCement Rus" in Novogurovsky with the inclusion of a new object - the Verkhneyashevsky subsoil plot and the change of the boundaries of the mining branch of JSC "Gurovo-Concrete" taking into account the construction of a NOx emission reduction system.
Based on the results of the work, a decision was made to establish a sanitary protection zone of the facility; information about the boundaries of the SPZ was entered in the EGRN.
During the work of JSC "SHANECO Group", passing examinations and receiving a decision on changing the SPZ, employees showed a high professional level, efficiency in solving tasks, including at the stage of technical support of project approval, the ability to make decisions quickly to achieve the goals set
The branch of LLC "HeidelbergCement Rus" in the village of Novogurovsky thanks JSC "SHANECO Group" for cooperation and recommends to perform similar work
Director of the branch of LLC "HeidelbergCement Rus" in the village of Novogurovsky I. Weiss -
JSC "Vyksa Metallurgical Plant" thanks the staff of SHANECO Group JSC for the high-quality and timely execution of environmental risk assessment work within the framework of the Development Concept of the Foundry and Rolling Complex Division of oil and gas pipeline pipes of JSC "VMZ".
The work was carried out at a high professional level, all significant environmental aspects of the planned activity were analyzed, measures were proposed to ensure environmental quality standards.
Production Safety Director A.V. Pivikov
-
In 2021, the Krasnoyarsk branch of "SHANECO Siberia" JSC "SHANECO Group" carried out research and assessment of the radiation situation within the framework of engineering and environmental surveys for the object "Development of project documentation for the construction of an underground water intake at the Kitoisk underground water field for the water supply of the population of the Angarsk city district"".
The specialists of the Krasnoyarsk branch of "SHANECO Siberia" performed a complex of field observations, laboratory studies and compiled a report in accordance with the issued assignment.
The entire complex of radiation studies was carried out in full compliance with the requirements of regulatory documents, in a timely manner.
We note the high reliability of observations, thoroughness of study, analysis and generalization of the results obtained, competent design of reporting materials.
We thank the Krasnoyarsk branch of "SHANECO Siberia" JSC "GC SHANECO" for fruitful cooperation. We especially note the high qualification of the branch's specialists.
JSC "Krasnoyarsk Institute of Vodokanalproekt" recommends the Krasnoyarsk branch of "SHANECO Siberia" JSC "SHANECO Group " as a qualified performer of similar works.
General Director G.V. Krasavin
-
The management and specialists of Migroup Project LLC express their gratitude to JSC "SHANECO Group" for the high-quality and timely execution of work on the adjustment of engineering-hydrometeorological and environmental surveys under the project of JSC Lebedinsky GOK. Processing plant. Tailgating workshop. Section of sludge and rock systems. Thickener No. 1" in 2021 and successful support within the framework of the state environmental assessment and the FAA "Glavgosekpertiza of Russia" in 2022.
We hope for further constructive and fruitful cooperation.
General Director N.A. Babich