SHANECO
design
institute
RU
EN
Institute
Services
Projects
Media Center
Contacts
Abakansky mine
Service:
Preliminary environmental assessment of the reconstruction project
Environmental Impact Assessment of the proposed construction of the ISOMALK-2 low-temperature isomerisation unit
Public consultations of the proposed activity
The “List of environmental activities” section of design documents for the proposed construction project
Home
Projects
Region:
Khakasia Republic
Industry:
Mining
See also
All projects
An LHG terminal
External power supply to Main Pump Station 1, Pump Stations 2 and 3 for the Kuyumba-Taishet main oil pipeline